BLD-Blower Door Test Results | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | DONE |
Tell Riley
|
|
|
10033 Eshelman--4.6 ACH50//1000cfm @ 50 Pa
10021 Eshelman--4.6 ACH50//1000cfm @ 50 Pa
|
BLD-Final | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | PASS |
Tell Riley
|
|
|
call me for entry code , blower door test has passed on both units Phone #: ###-#### Inspection requested via web by kevin debelloy
|
DOC - Permit Finaled | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 7/18/2019 | 7/19/2019 | 7/19/2019 | A | NR |
Tell Riley
|
|
|
please call before arrival so I can meet you there to gain access.
Thanks ~Kevin ###-#### Phone #: ###-#### Inspection requested via web by kevin debelloy//need blower door tests//
|
BLD-Energy code compliance | 5/14/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Framing/Rough-in | 5/14/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Framing/Rough-in | 5/9/2019 | 5/9/2019 | 5/9/2019 | A | FAIL |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy C/N posted.
|
BLD-Wall Bracing | 5/8/2019 | 5/8/2019 | 5/8/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Foundation | 3/18/2019 | 3/18/2019 | 3/19/2019 | P | DONE |
Tony Young
|
|
|
Pour is set for 1:30 should be ready for inspection anytime today Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Footing | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | PASS |
Jim Sly
|
|
|
Footings pour is scheduled for 1:30 and is ready anytime for inspection before that Phone #: ###-#### Inspection requested via web by kevin debelloy
|
CHANGE STATUS TO (ISS) | | | 3/14/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/14/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 2/7/2019 | | |
|
|
|
|
Plan assigned to (BJM) | 1/29/2019 | 1/29/2019 | 2/7/2019 | | DONE |
Brian McGowan
|
|
|
02/05 Plan Mod - Corrections Required (Mechanical)
|
Routing - MECHANICAL | 2/7/2019 | | 2/7/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report. Changed to ductless system.
|
Plan Reviewer's activity | | | 2/7/2019 | | DONE |
Brian McGowan
|
|
|
Please add (1) hour of Plan modification Fees.
|
Routing - PLAN CHECK | 2/7/2019 | | 2/7/2019 | | PASS |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/7/2019 | | DONE |
|
|
|
plan mod fee - do not reissue
|
Routing - PLAN CHECK | 2/6/2019 | | 2/6/2019 | | FAIL |
Brian McGowan
|
|
|
Need Mechanical corrections resolved
|
Routing - MECHANICAL | 2/4/2019 | | 2/4/2019 | | FAIL |
Troy James
|
|
|
Emailed corrections to Jeff
|
Routing - PLAN CHECK | 1/30/2019 | | 1/31/2019 | | FAIL |
Brian McGowan
|
|
|
Manual J required, verification of footing design at concentrated load points.
|
Plan Modification Accepted | | | 1/29/2019 | | DONE |
|
|
|
roof framing modification and making kitchen bigger
|
Inspection Record Card- Bld | | | 11/26/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/26/2018 | | DONE |
|
|
|
|
Extend Review Timeline | | | 10/22/2018 | | DONE |
|
|
|
1st Apporved 180 day extension per Adele. See documents
|
Meeting | | | 9/25/2018 | | DONE |
|
|
|
extesion request sent in
|
Expiration Notice | 8/28/2018 | 9/19/2018 | 8/28/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 8/3/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 8/3/2018 | | DONE |
|
|
|
All requirements met
|
Plan assigned to (BJM) | 4/9/2018 | 4/9/2018 | 8/2/2018 | | DONE |
Brian McGowan
|
|
|
1st review complete - Fail- 4-20 sfd L1 eplan
|
Routing - PLAN CHECK | 8/2/2018 | | 8/2/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 7/12/2018 | | 7/12/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 7/11/2018 | | 7/11/2018 | | PASS |
Celine Acord
|
|
|
|
1st review completed | | | 4/20/2018 | | FAIL |
Brian McGowan
|
|
|
Various Items
|
Routing - PLAN CHECK | 4/9/2018 | | 4/20/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLANNING | 4/9/2018 | | 4/20/2018 | | FAIL |
Celine Acord
|
|
|
|
Routing - MECHANICAL | 4/9/2018 | | 4/11/2018 | | FAIL |
Chad Schwendiman
|
|
|
Orientation of the units is wrong on the manual J's, Need to show project address for project information
|
Route to Impact Fee Review | 4/9/2018 | 4/12/2018 | 4/10/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plans ACCEPTED BY PLAN TECH | | | 4/9/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/9/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/9/2018 | | DONE |
|
|
|
|
Routing - Addressing | 4/9/2018 | | 4/9/2018 | | PASS |
Doug Chausow
|
|
|
Unit A: 10033 W Eshelman St
Unit B: 10021 W Eshelman St
|
Routing - PUBLIC WORKS | 4/9/2018 | | 4/9/2018 | | PASS |
Morgan Webb
|
|
|
|
Telephone call | | | 4/5/2018 | | DONE |
|
|
|
Jeff called-keeps getting notices in e plan-says he's got 4 and the last email he got said they'd only send 5 noitces. I told him he would fine as long as it diodn't go past the 180 day period
|
Application received | | | 3/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 20 2018 2:48PM
|