Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD18-00982
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameC32985 B27 Tenant Improvements
Customer NumberC32985
ePlanReviewYes
Description
(MICRON B27) Tenant Improvement (Existing): C32985 B27. PLAN MOD TO INSTALL FIRE DAMPER AND SEAL ALL PENETRATIONS IN EXISTING FIRE BARRIER WALL BETWEEN FITNESS CENTER AND HEALTH CLINIC. 06/25/18 JAR. Permit to remodel the fitness center, locker rooms, and clinic. Work to include: demo of existing interior nonbearing partition walls, finishes, and plumbing; new interior non-bearing partition walls; new accessible showers; new plumbing fixtures; new cabinetry; upgrade corridor sprinkler heads to quick response heads; new interior finishes in compliance the 2015 IBC Ch. 8. Electrical and HVAC to remain and be reused and relocated as required. All construction per the approved plans. This is a fully fire sprinklered and alarmed building. Any alterations to the sprinkler or alarm system are required to comply with NFPA 13 and 72 respectively as regulated by the fire department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/18/20189/10/2018 DONE
mailed 9-11-18
First Notice 7/12/20188/8/2018 DONE
mailed 8-10-18
BLD-Final6/27/20186/28/20187/2/2018APASS
DetailsDave Hannah
Robert Phone #: ###-####
Print Occupancy Form  7/2/2018 DONE
Permanent Occupancy UNPAID FEE  7/2/2018 DONE
Permit Ready to Issue  6/26/2018 DONE
PLAN MOD
CHANGE STATUS TO (ISS)  6/26/2018 DONE
Plan assigned to (JAR)6/15/20186/15/20186/25/2018 DONE
DetailsJulie Romig
Plan Mod - 1st Rev Comp - add fire damper at mechanical ducts through 1 hr fire wall
PLANS/APPL TAKEN TO FRONT DESK  6/25/2018 DONE
Plan assigned to (JAR)6/12/20186/12/20186/22/2018 CANC
DetailsJulie Romig
Plan Mod - add exterior canopy for bicycle storage
Routing - PLAN CHECK6/16/2018 6/21/2018 FAIL
DetailsJulie Romig
Plan Mod - Need additional information based on inspector's site observations of existing conditions not shown on plans (masonry wall construction)
BLD-Final6/15/20186/15/20186/15/2018APART
DetailsJim Storey
Ok for temp occupancy. Fiinal occupancy pending complition of plan mod submitted for mechanical penetrations. Reinspection required for final.
Plan Modification Accepted  6/15/2018 DONE
DetailsChristina Prado
Plan Mod - add fire damper at mechanical ducts through 1 hr fire wall
BLD-Final6/13/20186/14/20186/14/2018PFAIL
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Robert Snow openings above ceilling at 1hr wall need submited for protection and permits.
FIRE-Final Inspection6/12/20186/13/20186/13/2018PPASS
DetailsJim Page
Final life fire safety inspection for scope of work complete.

I need to know if we need to test the fire alarm system as part of this inspection so I can coordinate with Micron''s fire system folks. Please call me and let me know. ###-#### Phone #: ###-#### Inspection requested via web by Robert Snow
Fees Due Hold6/13/2018 6/13/2018 DONE
DetailsCandy A. Nichols
CHANGE STATUS TO (ISS)  6/12/2018 DONE
DetailsChristina Prado
Plan Mod request revoked by applicant, status changed back to ISS
Plan Modification Accepted  6/12/2018 CANC
DetailsChristina Prado
Plan Mod - add exterior canopy for bicycle storage
Fees Due Hold5/17/2018 5/25/2018 DONE
DetailsChristina Prado
Fees Due Hold5/3/2018 5/16/2018 DONE
DetailsChristina Prado
BLD-Framing/Rough-in5/2/20185/2/20185/2/2018PPART
DetailsJim Storey
This project is in Building 27 . Phone #: ###-#### Inspection requested via web by Robert Snow wall framing pass ok to cover// c/n 1 hr fire barrior opening protection of thur penatrations needs addressed.
Fees Due Hold5/2/2018 5/2/2018 DONE
DetailsChristina Prado
Issue & PRINT to be Invoiced  5/1/2018 DONE
DetailsChristina Prado
Print Occupancy Form  5/1/2018 DONE
Plan assigned to (JAR)3/23/20183/23/20184/20/2018 DONE
DetailsJulie Romig
1st Rev Comp - 2nd Rec'd 04/16 - L2 Micron B27
Routing - PLAN CHECK4/16/2018 4/20/2018 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  4/20/2018 DONE
Permit Ready to Issue  4/20/2018 DONE
DetailsChristina Prado
Need
GC Form - met
Revised Cert of Value(if mircon is not GC) - met
Route to Impact Fee Review4/9/20184/12/20184/10/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK3/23/2018 4/9/2018 FAIL
DetailsJulie Romig
1st review completed  4/9/2018 FAIL
DetailsJulie Romig
Routing - FIRE3/23/20183/23/20184/5/2018 PASS
DetailsScott Arellano
Attached comments to case
Routing PW Environmental3/26/2018 3/26/2018 PASS
DetailsTerry Alber
No issues.
Routing - PUBLIC WORKS3/23/2018 3/26/2018 PASS
DetailsRachael Beierle
Routing - Addressing3/23/2018 3/23/2018 PASS
DetailsDoug Chausow
Intake Approval  3/23/2018 PASS
Application received  3/20/2018 DONE
Application submitted via PDS Online on Mar 20 2018 3:18PM