Permit Information
Permit NumberBLD18-00992
StatusFinaled
Name STOUT BUILDING CONTRACTORS LLC
Site Address 1845 S FEDERAL WAY
Project NamePeace Valley Charter School
Customer NumberBLD18-01919 EARLY START
ePlanReviewYes
Description
(PEACE VALLEY CHARTER SCHOOL) (CUP17-00086) (DRH18-00141) (Demo Permit BLD18-01222) (Early Start BLD18-01919). 08/01/18 PLAN MODIFICATION FOR MECHANICAL PLAN REVISIONS TO SHEET M-2. JAR. **Permit for the remodel of an existing 21,559 sq ft office building to convert it to a school. Work to include: site work; interior non-bearing partitions; interior and exterior doors; new openings in roof for skylights; new openings in exterior concrete wall for windows; interior relites; plumbing, mechanical, and electrical; and interior finishes in compliance with Ch. 8 of the 2015 IBC. This building will be fully Fire Sprinklered for area increase with an approved Fire Alarm system. The Fire Sprinkler and Fire Alarm systems WILL REQUIRE SEPARATE PERMITS and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  5/1/2019 DONE
Third Notice 12/19/201812/21/2018 DONE
This permit finaled on the web by Anthony Hewlett
Third Notice 11/12/201812/14/2018 DONE
mailed 12-17
Second Notice 10/22/201811/7/2018 DONE
mailed 11-12
First Notice 10/1/201810/12/2018 DONE
mailed 10-15-18
Print Occupancy Form  9/21/2018 DONE
Permanent Occupancy  9/21/2018 DONE
BLD-Final9/12/20189/12/20189/12/2018PPASS
DetailsJim Storey
Call ahead for access - Laura (school director) Phone #: ###-####
Zoning Approval9/10/20189/10/20189/10/2018 DONE
DetailsAndrea Tuning
BLD-Final8/30/20188/31/20188/31/2018PPART
DetailsMike Jordan
Richard Phone #: ###-####. Ok for temp occ. Waiting on tempered glazing to be installed.
FIRE-Final Inspection8/30/20188/31/20188/31/2018APASS
DetailsTroy Cobbley
Life safety passed

Richard Phone #: ###-####
Temporary Occupancy8/31/201811/29/20188/31/2018 DONE
DetailsChristina Prado
Zoning Approval Temp8/31/20188/31/20188/31/2018 DONE
DetailsAndrea Tuning
A bond has been posted for landscaping and site clean up.
FIRE-Conference8/29/20188/29/20188/29/2018PDONE
DetailsTroy Cobbley
We spoke of fire extinguisher placement, the removal of the shrubs obstructing the FDC, placement of the outside alarm bell at the FDC, and placement of the knox key box. We also discussed removing the ceiling T-bar wireing from the sprinkler piping.
Print Occupancy Form  8/28/2018 DONE
BLD-Ceiling Grid Inspection8/24/20188/24/20188/24/2018PPASS
DetailsJim Storey
Richard Phone #: ###-#### ceilling ok pending mech aproval
BLD-Conference8/16/20188/16/20188/16/2018PDONE
DetailsBob Archibald
Met with contractor and discussed requirements for temp/final occupancy. required signatures, life safety provisions, etc..
OVERRIDE  8/2/2018  
Plan assigned to (JAR)8/1/20188/1/20188/2/2018 DONE
DetailsJulie Romig
Plan Mod 1
Routing - PLAN CHECK8/1/2018 8/2/2018 PASS
DetailsJulie Romig
Plan Mod 1
Routing - MECHANICAL8/2/2018 8/2/2018 PASS
DetailsChad Schwendiman
Permit Ready to Issue  8/2/2018 DONE
Plan Mod Approved
DO NOT REISSUE
Change back to issued status after plan mod fees are paid
Print Occupancy Form  8/2/2018 DONE
CHANGE STATUS TO (ISS)  8/2/2018 DONE
Plan Modification Accepted  8/1/2018 DONE
Plan Mod accepted-changes to mechanical-sheet M-2 -
BLD-Framing/Rough-in7/17/20187/17/20187/17/2018PPASS
DetailsJim Storey
Richard Phone #: ###-####
(F) Reprint permit  7/17/2018 DONE
Issue PAID IN FULL permit  7/16/2018 DONE
Print Occupancy Form  7/16/2018 DONE
Telephone call  7/9/2018 DONE
received emailed from Michael Wright that ACHD is still revieweing permit. see attached email from him
OVERRIDE  7/6/2018  
Plan assigned to (JAR)5/24/20185/24/20187/6/2018 DONE
DetailsJulie Romig
**1st Rev Comp - 2nd Rec'd - L3 Peace Valley Charter School
Routing Off Site - STRUCTURAL6/29/2018 7/6/2018 PASS
DetailsJulie Romig
Routing - PLAN CHECK6/29/2018 7/6/2018 PASS
DetailsJulie Romig
Plans redlined; see plan review report for list of redlines.
PLANS/APPL TAKEN TO FRONT DESK  7/6/2018 DONE
Permit Ready to Issue  7/6/2018 DONE
Need- all met
ACHD
MET-Updated GC Form
MET-Updated Revised cert of value
(doc final BLD18-01222 and BLD18-01919 before issuing this permit, and move/attach all trade permits to this building permit)
Route to Impact Fee Review6/21/20186/24/20186/21/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE5/24/20185/24/20186/21/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - PLAN CHECK5/24/2018 6/21/2018 FAIL
DetailsJulie Romig
1st review completed  6/21/2018 DONE
Routing - PLANNING6/11/2018 6/11/2018 PASS
DetailsDavid Moser
2nd Review
Routing - Design Review6/11/2018 6/11/2018 PASS
DetailsAndrea Tuning
2nd Review
Routing Off Site - STRUCTURAL5/24/2018 6/8/2018 FAIL
DetailsJulie Romig
Routing - MECHANICAL5/24/2018 6/4/2018 PASS
DetailsTroy James
Routing PW Drainage5/24/2018 5/29/2018 PASS
DetailsBrian Murphy
Routing - PLANNING5/24/2018 5/25/2018 FAIL
DetailsDavid Moser
Add to the lanscape plan Class I Trees along south property line next to back parking lot as per DR.
Routing - Design Review5/24/2018 5/25/2018 FAIL
DetailsAndrea Tuning
The required 6 bicycle parking spaces are required to be located within an approved bicycle rack. Submit a detail sheet of the proposed bicycle rack for review and final approval.
Install 6 Class II Street trees along Federal Way.
Install 12 Class I trees along the south property line.
Routing - PLUMBING5/24/2018 5/24/2018 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - Addressing5/24/2018 5/24/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/24/2018 5/24/2018 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment5/24/2018 5/24/2018 PASS
DetailsMichael Zawacki
Waiver received and approved.
Intake Approval  5/24/2018 PASS
Plan Reviewer's activity  5/24/2018 DONE
DetailsCarl D Madsen
Jeff, Just a reminder that you need to provide documentation from ACHD of any fees that are due or that have been paid on this project. Any ACHD fee are required to be paid prior to the issuance of the building permit. Fees may be paid directly to ACHD or at the time of permit issuance. If the fees have been paid please provide documentation that the fees have been paid. The Phone number for ACHD is ###-####.
Intake Approval  4/26/2018 FAIL
Routing - Design Review4/12/2018 4/12/2018 FAIL
DetailsAndrea Tuning
The applicant is required to obtain Design Review approval for the proposal.
Intake Approval  4/10/2018 FAIL
Application received  3/21/2018 DONE
Application submitted via PDS Online on Mar 21 2018 2:25PM