Print Statement | | | 5/1/2019 | | DONE |
|
|
|
|
Third Notice | | 12/19/2018 | 12/21/2018 | | DONE |
|
|
|
This permit finaled on the web by Anthony Hewlett
|
Third Notice | | 11/12/2018 | 12/14/2018 | | DONE |
|
|
|
mailed 12-17
|
Second Notice | | 10/22/2018 | 11/7/2018 | | DONE |
|
|
|
mailed 11-12
|
First Notice | | 10/1/2018 | 10/12/2018 | | DONE |
|
|
|
mailed 10-15-18
|
Print Occupancy Form | | | 9/21/2018 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/21/2018 | | DONE |
|
|
|
|
BLD-Final | 9/12/2018 | 9/12/2018 | 9/12/2018 | P | PASS |
Jim Storey
|
|
|
Call ahead for access - Laura (school director) Phone #: ###-####
|
Zoning Approval | 9/10/2018 | 9/10/2018 | 9/10/2018 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 8/30/2018 | 8/31/2018 | 8/31/2018 | P | PART |
Mike Jordan
|
|
|
Richard Phone #: ###-####. Ok for temp occ. Waiting on tempered glazing to be installed.
|
FIRE-Final Inspection | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Richard Phone #: ###-####
|
Temporary Occupancy | 8/31/2018 | 11/29/2018 | 8/31/2018 | | DONE |
Christina Prado
|
|
|
|
Zoning Approval Temp | 8/31/2018 | 8/31/2018 | 8/31/2018 | | DONE |
Andrea Tuning
|
|
|
A bond has been posted for landscaping and site clean up.
|
FIRE-Conference | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | DONE |
Troy Cobbley
|
|
|
We spoke of fire extinguisher placement, the removal of the shrubs obstructing the FDC, placement of the outside alarm bell at the FDC, and placement of the knox key box. We also discussed removing the ceiling T-bar wireing from the sprinkler piping.
|
Print Occupancy Form | | | 8/28/2018 | | DONE |
|
|
|
|
BLD-Ceiling Grid Inspection | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | PASS |
Jim Storey
|
|
|
Richard Phone #: ###-#### ceilling ok pending mech aproval
|
BLD-Conference | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | DONE |
Bob Archibald
|
|
|
Met with contractor and discussed requirements for temp/final occupancy. required signatures, life safety provisions, etc..
|
OVERRIDE | | | 8/2/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 8/1/2018 | 8/1/2018 | 8/2/2018 | | DONE |
Julie Romig
|
|
|
Plan Mod 1
|
Routing - PLAN CHECK | 8/1/2018 | | 8/2/2018 | | PASS |
Julie Romig
|
|
|
Plan Mod 1
|
Routing - MECHANICAL | 8/2/2018 | | 8/2/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Permit Ready to Issue | | | 8/2/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
Change back to issued status after plan mod fees are paid
|
Print Occupancy Form | | | 8/2/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/2/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/1/2018 | | DONE |
|
|
|
Plan Mod accepted-changes to mechanical-sheet M-2 -
|
BLD-Framing/Rough-in | 7/17/2018 | 7/17/2018 | 7/17/2018 | P | PASS |
Jim Storey
|
|
|
Richard Phone #: ###-####
|
(F) Reprint permit | | | 7/17/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/16/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/16/2018 | | DONE |
|
|
|
|
Telephone call | | | 7/9/2018 | | DONE |
|
|
|
received emailed from Michael Wright that ACHD is still revieweing permit. see attached email from him
|
OVERRIDE | | | 7/6/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 5/24/2018 | 5/24/2018 | 7/6/2018 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 2nd Rec'd - L3 Peace Valley Charter School
|
Routing Off Site - STRUCTURAL | 6/29/2018 | | 7/6/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 6/29/2018 | | 7/6/2018 | | PASS |
Julie Romig
|
|
|
Plans redlined; see plan review report for list of redlines.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/6/2018 | | DONE |
|
|
|
Need- all met
ACHD
MET-Updated GC Form
MET-Updated Revised cert of value
(doc final BLD18-01222 and BLD18-01919 before issuing this permit, and move/attach all trade permits to this building permit)
|
Route to Impact Fee Review | 6/21/2018 | 6/24/2018 | 6/21/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 5/24/2018 | 5/24/2018 | 6/21/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 5/24/2018 | | 6/21/2018 | | FAIL |
Julie Romig
|
|
|
|
1st review completed | | | 6/21/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 6/11/2018 | | 6/11/2018 | | PASS |
David Moser
|
|
|
2nd Review
|
Routing - Design Review | 6/11/2018 | | 6/11/2018 | | PASS |
Andrea Tuning
|
|
|
2nd Review
|
Routing Off Site - STRUCTURAL | 5/24/2018 | | 6/8/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - MECHANICAL | 5/24/2018 | | 6/4/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Drainage | 5/24/2018 | | 5/29/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 5/24/2018 | | 5/25/2018 | | FAIL |
David Moser
|
|
|
Add to the lanscape plan Class I Trees along south property line next to back parking lot as per DR.
|
Routing - Design Review | 5/24/2018 | | 5/25/2018 | | FAIL |
Andrea Tuning
|
|
|
The required 6 bicycle parking spaces are required to be located within an approved bicycle rack. Submit a detail sheet of the proposed bicycle rack for review and final approval.
Install 6 Class II Street trees along Federal Way.
Install 12 Class I trees along the south property line.
|
Routing - PLUMBING | 5/24/2018 | | 5/24/2018 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 5/24/2018 | | 5/24/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/24/2018 | | 5/24/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 5/24/2018 | | 5/24/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver received and approved.
|
Intake Approval | | | 5/24/2018 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 5/24/2018 | | DONE |
Carl D Madsen
|
|
|
Jeff, Just a reminder that you need to provide documentation from ACHD of any fees that are due or that have been paid on this project. Any ACHD fee are required to be paid prior to the issuance of the building permit. Fees may be paid directly to ACHD or at the time of permit issuance. If the fees have been paid please provide documentation that the fees have been paid. The Phone number for ACHD is ###-####.
|
Intake Approval | | | 4/26/2018 | | FAIL |
|
|
|
|
Routing - Design Review | 4/12/2018 | | 4/12/2018 | | FAIL |
Andrea Tuning
|
|
|
The applicant is required to obtain Design Review approval for the proposal.
|
Intake Approval | | | 4/10/2018 | | FAIL |
|
|
|
|
Application received | | | 3/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 21 2018 2:25PM
|