Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-00999
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 1330 E EXCHANGE ST
Project NameDonahue McNamara Steel, LLC
Customer NumberGRD17-00075
ePlanReviewYes
Description
(DONAHUE MCNAMARA STEEL LLC) Permit to construct a new 5,711 sq. ft. one story, pre-engineered metal office/warehouse building and related site improvements. Scope of work includes: construction of footing foundation, slab on grade concrete floor, electrical work and site work. This building will be fully Fire Sprinklered and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Note: Special Inspections Required see form 310. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/19/2019 DONE
First Notice 6/22/20197/10/2019 DONE
mailed 7-11
PubWorks Occupancy Approval6/12/20196/12/20196/12/2019 DONE
DetailsTiffany Lowery
Permanent Occupancy  6/12/2019 DONE
BLD-Final6/6/20196/7/20196/7/2019PPASS
DetailsJim Storey
Please call before arriving. Thank you. Phone #: ###-#### Inspection requested via web by Joel Hartman sign offs pw/zone/achd ok for perm no card on site
Zoning Approval6/7/20196/7/20196/7/2019 PASS
DetailsKatelyn Menuge
BLD-Final4/30/20195/1/20195/1/2019PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joel Hartman need sign offs pw/zone/achd
FIRE-Final Inspection4/30/20195/1/20195/1/2019APASS
DetailsTroy Cobbley
life safety passed


Phone #: ###-#### Inspection requested via web by Joel Hartman
BLD-Final4/30/20194/30/20194/30/2019PCANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Joel Hartman Inspection cancelled from web by: Joel Hartman
FIRE-Final Inspection4/29/20194/30/20194/30/2019ACANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Joel Hartman Inspection cancelled from web by: Joel Hartman
BLD-Final4/29/20194/30/20194/30/2019PCANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Joel Hartman Inspection cancelled from web by: Joel Hartman
FIRE-Final Inspection4/25/20194/26/20194/26/2019AFAIL
DetailsJim Page
Exit discharge emergency lighting on shop bay exits did not illuminate with power loss, exit discharge landings are required to have emergency egress illumination to be code compliant.

Joel Phone #: ###-####
BLD-Ceiling Grid Inspection2/5/20192/5/20192/5/2019PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joel Hartman
BLD-Wall cover12/28/20181/3/20191/3/2019APASS
DetailsJim Storey
Please call when headed to site. Phone #: ###-#### Inspection requested via web by Joel Hartman
BLD-Wall cover12/28/20181/2/201912/28/2018ACANC
DetailsJim Storey
Please call when heading over to site. Thank you. Phone #: ###-#### >> Inspection requested via web by Joel Hartman Inspection cancelled from web by: Joel Hartman
BLD-Wall cover12/26/201812/26/201812/26/2018ACANC
DetailsJim Storey
inspect densglass before water proofing membrane. Phone #: ###-#### >> Inspection requested via web by Joel Hartman Inspection cancelled from web by: Joel Hartman
BLD-Framing/Rough-in12/5/201812/6/201812/6/2018APASS
DetailsJim Storey
Please call when you get to the site, or headed that way. Thank you, Joel Phone #: ###-#### Inspection requested via web by Joel Hartman framing ok pending trades ok to cover
BLD-Other9/24/20189/24/20189/24/2018PPASS
DetailsJim Storey
Masonry rebar. Phone #: ###-#### Inspection requested via web by Joel Hartman
BLD-Footing8/15/20188/15/20188/15/2018PPASS
DetailsJim Storey
Footing inspection at Trash Enclosure. Phone #: ###-#### Inspection requested via web by Joel Hartman
BLD-Foundation7/26/20187/27/20187/27/2018PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joel Hartman
BLD-Foundation7/25/20187/26/20187/26/2018PCANC
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Joel Hartman Inspection cancelled from web by: Joel Hartman
BLD-Footing7/19/20187/20/20187/20/2018APASS
DetailsJim Storey
Early AM please, trying to place concrete at 11:00 AM. Phone #: ###-#### Inspection requested via web by Joel Hartman si on site
Issue PAID IN FULL permit  7/6/2018 DONE
Print Occupancy Form  7/6/2018 DONE
OVERRIDE  5/21/2018  
Plan assigned to (JG)3/30/20183/30/20185/21/2018 PASS
DetailsJavier Guzman
1st rev comp, 4/26 Donahue McNamara Steel New building ePlan--
Routing PW Drainage5/21/2018 5/21/2018 PASS
DetailsBrian Murphy
PLANS/APPL TAKEN TO FRONT DESK  5/21/2018 DONE
Permit Ready to Issue  5/21/2018 DONE
DetailsChristina Prado
Need:
ACHD - met, need receipt or payment 6/29/18
RP - N/A see GRD18-00075, attached ESC voided
GC - met
Revised Certificate of Value - met
Routing - PLAN CHECK5/15/2018 5/19/2018 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL5/15/2018 5/19/2018 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers Chris Holladay
Routing PW Sewer Design5/15/2018 5/18/2018 PASS
DetailsDeAnn Brown
Route to Impact Fee Review5/1/20185/4/20185/3/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK3/30/2018 5/1/2018 FAIL
DetailsJavier Guzman
1st review completed  5/1/2018 DONE
DetailsJavier Guzman
Routing Off Site - STRUCTURAL3/30/2018 4/30/2018 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ Engineers Chris Holladay
Routing - FIRE3/30/20183/30/20184/25/2018 PASS
DetailsErika Akin
Attached comments to case
Routing PW Sewer Design4/2/2018 4/6/2018 FAIL
DetailsDeAnn Brown
Please make corrections specified in changemarks on utility plan sheet C05 in eplanreview.
Routing PW Environmental4/2/2018 4/5/2018 PASS
DetailsRick Christenson
Exterior Interceptor will need to be rated for Flammable Liquids and vented properly if vehicle maintenance is being done in the shop area.
Routing - MECHANICAL3/30/2018 4/4/2018 PASS
DetailsTroy James
Asked applicant to provide letter from owner stating what type of work is being performed in the shop. Letter attached to documents
Routing - PLANNING3/30/2018 4/2/2018 PASS
DetailsDavid Moser
See DRH17-00443
Routing - Addressing3/30/2018 4/2/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/30/2018 4/2/2018 PASS
DetailsRachael Beierle
Routing PW Solid Waste4/2/2018 4/2/2018 PASS
DetailsEvan Carpenter
Routing PW Drainage4/2/2018 4/2/2018 PASS
DetailsBrian Murphy
Routing PW Street Lights4/2/2018 4/2/2018 PASS
DetailsTom Marshall
Intake Approval  3/30/2018 PASS
Routing - PLUMBING3/30/2018 3/30/2018 PASS
DetailsBill VanDegrift
See redline notes, and install per ISPC.
Routing - Design Review3/30/2018 3/30/2018 PASS
DetailsKatelyn Menuge
DRH17-00443
Intake Approval  3/26/2018 FAIL
DetailsJulie Romig
Application received  3/22/2018 DONE
Application submitted via PDS Online on Mar 22 2018 8:40AM