BLD-Final | 7/9/2018 | 7/10/2018 | 7/10/2018 | A | PASS |
Dave Hannah
|
|
|
Call 20 mins. before to meet // Ben Phone #: ###-####
|
DOC - Permit Finaled | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Dave Hannah
|
|
|
framing & shear reinsp // Ben Phone #: ###-####
|
BLD-Framing/Rough-in | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | FAIL |
Mike Jordan
|
|
|
Ben Phone #: ###-####. Install blocking at panel edges at corners of structure for 4ft. ither direction and fasten as shown on the approved plans. Correction notice issued.
|
BLD-Foundation | 5/11/2018 | 5/14/2018 | 5/14/2018 | A | PASS |
Dave Hannah
|
|
|
wall- Ben Phone #: ###-####
|
OVERRIDE | | | 4/3/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 4/3/2018 | 4/3/2018 | 4/3/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 4/3/2018 | 4/3/2018 | 4/3/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/3/2018 | | 4/3/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/3/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/3/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/3/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/3/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 3/22/2018 | 3/22/2018 | 3/22/2018 | A | CANC |
Brian McGowan
|
|
|
no contact
|
1st review completed | | | 3/22/2018 | | DONE |
Josh Bogle
|
|
|
|
Application received | | 3/22/2018 | | | |
|
|
|
|