BLD-Final | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | DONE |
Tony Young
|
|
|
Terry Phone #: ###-####
|
BLD-Foundation | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | DONE |
Tony Young
|
|
|
Terry Phone #: ###-####
|
DOC - Permit Finaled | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 11/21/2018 | 11/21/2018 | 11/21/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Foundation | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PART |
Tony Young
|
|
|
Wall // Tommy Phone #: ###-####,, work in progress
|
BLD-Footing | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | CANC |
Brandon Shaw
|
|
|
Tommy Phone #: ###-####
|
BLD-Footing | 9/13/2018 | 9/13/2018 | 9/14/2018 | P | PASS |
Jim Sly
|
|
|
Tommy-retaining wall Phone #: ###-####
|
PubWorks Subgrade Approval | 9/14/2018 | 9/14/2018 | 9/14/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | NR |
Jim Sly
|
|
|
Tommy Phone #: ###-####
|
BLD-Footing | 9/11/2018 | 9/12/2018 | 9/12/2018 | A | NR |
Jim Sly
|
|
|
Tommy-sign off card on south side of house on power box Phone #: ###-#### Need Public Works approval.
|
(F) Reprint permit | | | 8/28/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/28/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/17/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/12/2018 | | |
|
|
|
|
Plan assigned to (RDP) | | 3/23/2018 | 7/12/2018 | | DONE |
Rob Patrick
|
|
|
Failed for Hillside requirements
|
Inspection Record Card- Bld | | | 7/12/2018 | | DONE |
|
|
|
|
Telephone call | | | 7/12/2018 | | DONE |
|
|
|
left a message for jon informing permit is ready, fee amount and what is needed
|
Case Summary (BLD) | | | 7/12/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 7/12/2018 | | DONE |
|
|
|
NEED
GC FORM
RP (if owner is not GC)
|
Routing - PLAN CHECK | | | 7/12/2018 | | PASS |
Rob Patrick
|
|
|
|
Routing - PLANNING | | | 7/12/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Erosion and Sediment | | | 7/11/2018 | | PASS |
Michael Zawacki
|
|
|
RP still needed. Hillside lot, site prep inspection required.
|
Routing PW Grading-Hillside | 7/5/2018 | | 7/11/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor ###-####.
|
Routing - Addressing | 7/5/2018 | | 7/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Plan resubmittals received | | | 7/3/2018 | | DONE |
Christina Prado
|
|
|
Received two set retaining wall calcs, two boulder wall calcs and 4 sets of plan sheets marked L1.1, L1.5 & L2.1; Plans stamped and taken to RDP for review
|
Routing - PLAN CHECK | | | 3/28/2018 | | FAIL |
Rob Patrick
|
|
|
|
1st review completed | | | 3/28/2018 | | FAIL |
Rob Patrick
|
|
|
.
|
Routing - PLANNING | | | 3/27/2018 | | FAIL |
|
|
|
Hillside requires CFH, Planner to be determined once CFH is applied for
|
Routing - Erosion and Sediment | | | 3/27/2018 | | FAIL |
|
|
|
Hillside requires CFH, ESC review to be completed once CFH process is complete pending any resubmittal requirements
|
Routing PW Grading-Hillside | 3/23/2018 | | 3/27/2018 | | FAIL |
Melissa Jannusch
|
|
|
Project will require a CAT II Hillside application prior to acceptance of the building permit application. Application #114 will need to be filled out and turned in to the Planning & Zoning counter at city hall with the application fee. Once the application has been approved by P&Z please upload the approval letter and then this building permit case can be routed for approval. Melissa Jannusch ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 3/23/2018 | | DONE |
|
|
|
|
Intake Approval | | | 3/23/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/23/2018 | | DONE |
|
|
|
|
Application received | | 3/23/2018 | | | |
|
|
|
|