Permit Information
Permit NumberBLD18-01032
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 6141 E HOOTOWL DR
Project NameHN 82-1 Crestline
Customer Number 
ePlanReviewYes
Description
HILLSIDE, WUI ZONE "A", CLASS "A" ROOF REQUIRED. Plan Modification 7-2-18 - Eliminate second floor covered balcony and adding bay window to Master Bedroom. ***BJM*** Permit for the construction of a new 3837 sq. ft., two story (first story 2635 sq. ft., second story 1202 sq. ft.) single family dwelling with 5 bedrooms, 4.5 bathrooms, approximately 184 sq. ft. of covered patio/porch and a 933 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. ***BJM***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval1/9/20191/9/20191/9/2019 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Final1/4/20191/4/20191/4/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled1/4/20191/4/20191/4/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results1/4/20191/4/20191/4/2019PDONE
DetailsBrandon Shaw
ACH50- 3.1
BLD-Blower Door Test Results1/3/20191/3/20191/3/2019PCANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Final1/3/20191/3/20191/3/2019PNR
DetailsBrandon Shaw
Ned PLM final
BLD-Other10/3/201810/4/201810/4/2018APASS
DetailsBrandon Shaw
Rollo-soffit Phone #: ###-####
BLD-Energy code compliance10/2/201810/3/201810/3/2018APASS
DetailsBrandon Shaw
rolo Phone #: ###-####
BLD-Framing/Rough-in10/1/201810/1/201810/1/2018PPASS
DetailsBrandon Shaw
Rollo Phone #: ###-####
BLD-Foundation7/26/20187/26/20187/26/2018PPASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing7/25/20187/25/20187/25/2018APASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing7/23/20187/24/20187/24/2018ANR
DetailsBrandon Shaw
Need Geo subgrade and PW approval
PubWorks Subgrade Approval7/24/20187/24/20187/24/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

CHANGE STATUS TO (ISS)  7/23/2018 DONE
OVERRIDE  7/3/2018  
Plan assigned to (BJM)6/7/20186/7/20187/3/2018 DONE
DetailsBrian McGowan
Corrections required.
Plan assigned to (BJM)6/6/20186/6/20187/3/2018 DONE
DetailsBrian McGowan
plan mod-permit has not been issued but changes are needed-clicked on fees paid so i could start the plan mod and plan mod for baywindow changed, inderior door,removed 2nd floor covered balcony-assigned to Brian McGowan
Routing - PLAN CHECK6/6/2018 7/3/2018 PASS
DetailsBrian McGowan
Permit Ready to Issue  7/3/2018 DONE
Routing - PLANNING6/25/2018 6/25/2018 PASS
DetailsSue Cummings
Routing - PLAN CHECK6/7/2018 6/22/2018 FAIL
DetailsBrian McGowan
Shear at bay window was not updated. Beam needs resized or verified.
Routing PW Grading-Hillside6/7/2018 6/8/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Routing - PLANNING6/7/2018 6/7/2018 FAIL
DetailsSue Cummings
If you change the exterior in any way a new letter of approval from the HOA is required.
Routing - PUBLIC WORKS6/7/2018 6/7/2018 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside6/7/2018 6/7/2018 PASS
DetailsMelissa Jannusch
PLAN MOD APPROVED

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Plan resubmittals received  6/7/2018 DONE
plan mod for baywindow changed, inderior door,removed 2nd floor covered balcony-in e plan-assigned to plan reviewer Brian McGowan
OVERRIDE  5/18/2018  
Plan assigned to (BJM)4/17/20184/17/20185/18/2018 DONE
DetailsBrian McGowan
1st review complete - FAIL - 5-4 sfd L2 ePlan
Routing - PLAN CHECK5/18/2018 5/18/2018 FAIL
DetailsBrian McGowan
Still need corrections resolved.
Routing - PLAN CHECK5/18/2018 5/18/2018 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  5/18/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  5/18/2018 DONE
Routing - PLAN CHECK5/16/2018 5/16/2018 FAIL
DetailsBrian McGowan
Did not resolve all corrections
Routing - PLAN CHECK4/17/2018 5/4/2018 FAIL
DetailsBrian McGowan
1st review completed  5/2/2018 FAIL
DetailsBrian McGowan
REQUIRED ENGINEERING WAS NOT PROVIDED
Routing - FIRE4/17/20184/17/20184/30/2018 PASS
DetailsTim Frost
5/04 house e Plan
No review report required.
Routing PW Grading-Hillside4/18/2018 4/20/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Route to Impact Fee Review4/17/20184/20/20184/18/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL4/17/2018 4/18/2018 PASS
DetailsTroy James
Routing - PUBLIC WORKS4/17/2018 4/18/2018 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment4/17/2018 4/17/2018 PASS
DetailsMichael Zawacki
Harris North, foothill subdivision. Site prep inspection required.
Plans ACCEPTED BY PLAN TECH  4/17/2018 DONE
Intake Approval  4/17/2018 PASS
Recd Pcfee & Taken To Pln CK  4/17/2018 DONE
Routing - PLANNING4/17/2018 4/17/2018 PASS
DetailsSue Cummings
Routing - Addressing4/17/2018 4/17/2018 PASS
DetailsDoug Chausow
Application received  3/26/2018 DONE
Application submitted via PDS Online on Mar 26 2018 8:35AM