Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD18-01062
StatusFinaled
Name INTERMOUNTAIN WIND & SOLAR LLC
Site Address 5458 S YARROW PL
Project NameJames Ferguson Solar
Customer Number 
ePlanReviewYes
Description
MODIFICATION TO ADD 3 MORE PANELS **jab** Permit for 360sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 20 panels in 2 arrays tying into a Westinghouse panel. No work needed to the existing roof structure per engineer’s roof evaluation. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/6/20186/7/20186/7/2018PPASS
DetailsJim Storey
plans in meter box // Jen ext 123 Phone #: ###-####
DOC - Permit Finaled6/7/20186/7/20186/7/2018PPASS
DetailsJim Storey
BLD-Framing/Rough-in5/30/20185/31/20185/31/2018ANR
DetailsBrandon Shaw
Call Kelly when you are on your way Phone #: ###-#### Inspection requested via web by Ashley White
Plan assigned to (JAB) Josh5/18/20185/18/20185/24/2018 PASS
DetailsJosh Bogle
ePlanReview Plan Mod: add 3 additional panels and relocate a few to accomodate
Routing - PLAN CHECK5/24/2018 5/24/2018 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  5/24/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  5/24/2018 DONE
DO NOT REISSUE - plan mod
CHANGE STATUS TO (ISS)  5/24/2018 DONE
Plan Modification Accepted  5/18/2018 DONE
DetailsChristina Prado
add 3 additional panels and relocate a few to accomodate
Plan assigned to (JAB) Josh3/27/20183/27/20183/28/2018 PASS
DetailsJosh Bogle
due 4/2 - PV
Routing - PLAN CHECK3/27/2018 3/28/2018 PASS
DetailsJosh Bogle
1st review completed  3/28/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  3/28/2018 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  3/28/2018 DONE
DetailsTiffany Carson-Herker
All Requirements Met
Issue PAID IN FULL permit  3/28/2018 DONE
Application received  3/27/2018 DONE
Application submitted via PDS Online on Mar 27 2018 3:11PM
Plans ACCEPTED BY PLAN TECH  3/27/2018 DONE
Intake Approval  3/27/2018 PASS
Recd Pcfee & Taken To Pln CK  3/27/2018 DONE
Routing - PLANNING3/27/2018 3/27/2018 PASS
DetailsSue Cummings