BLD-Final | 8/6/2018 | 8/9/2018 | 8/9/2018 | A | PASS |
Dave Hannah
|
|
|
bracing was added to the hand stack truss system of the house and detached garage for the addition of solar arrays. The bracing was added per the engineering plans submitted with plan review.
Call customer for access to the attic, he will have a ladder set up for you. Attic access is inside the house in the hallway, and there is a light up there.
Approved plans are on site at the inverter. Phone #: ###-#### Inspection requested via web by Ryan King
|
DOC - Permit Finaled | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Dave Hannah
|
|
|
|
Plan assigned to (JAB) Josh | 4/4/2018 | 4/4/2018 | 6/28/2018 | | PASS |
Josh Bogle
|
|
|
1st done - PV - no roof structure info
|
Routing - PLAN CHECK | 6/28/2018 | | 6/28/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2018 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no - five Plan Checks, one hour min. fee
|
Permit Ready to Issue | | | 6/28/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/28/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/28/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/27/2018 | | 4/27/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/18/2018 | | 4/18/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/11/2018 | | 4/11/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/4/2018 | | 4/9/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 4/9/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 4/4/2018 | | 4/4/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Intake Approval | | | 4/4/2018 | | FAIL |
|
|
|
Plans uploaded as on file
|
Plans ACCEPTED BY PLAN TECH | | | 4/4/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/4/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/4/2018 | | DONE |
|
|
|
|
Application received | | | 3/28/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 28 2018 1:40PM
|