Plan assigned to (JAR) | 5/21/2018 | 5/21/2018 | 11/8/2018 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - L3 Rascal Flatts
|
VOIDED CHANGE STATUS | | | 8/9/2018 | | DONE |
|
|
|
see email in documents
|
Route to Impact Fee Review | 7/18/2018 | 7/21/2018 | 7/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 7/18/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 5/21/2018 | | 7/18/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 5/21/2018 | 5/21/2018 | 6/18/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing PW Environmental | 5/21/2018 | | 6/7/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing Off Site - STRUCTURAL | 5/21/2018 | | 6/5/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - MECHANICAL | 5/21/2018 | | 5/29/2018 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 5/21/2018 | | 5/22/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLANNING | 5/21/2018 | | 5/22/2018 | | PASS |
David Moser
|
|
|
Use allowed in C-5 zone but needs DR approval
|
Routing - PLUMBING | 5/21/2018 | | 5/21/2018 | | PASS |
Bill VanDegrift
|
|
|
See redline notes. AAV's not approved for use in commercial plumbing system. Install per ISPC.
|
Routing - PUBLIC WORKS | 5/21/2018 | | 5/21/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 5/21/2018 | | 5/21/2018 | | FAIL |
Andrea Tuning
|
|
|
A Design Review application will be required for the outdoor seating and exterior building modifications.
|
Plan Reviewer's activity | | | 5/21/2018 | | DONE |
Carl D Madsen
|
|
|
Also be sure to verify if any ACHD fees are due as this is a first time build out of the space. You can either pay fees in advance to ACHD or they may be paid at the time the permit is issued. Verification of the fees being paid, the amount of fees due or that no fees are due are required prior to the issuance of any permit.
|
Intake Approval | | | 5/21/2018 | | PASS |
|
|
|
|
Intake Approval | | | 3/30/2018 | | FAIL |
Julie Romig
|
|
|
1. Fire flow at hydrants letter.
2. Reduce file size of sheets a8.2, a8.3, and a8.4 to less than 1MB - files are too large to open.
3. Update Lighting COMcheck for 2015 IECC.
4. Provide verification existing roof structure has been designed for new MAU mounted on roof.
|
Application received | | | 3/28/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 28 2018 3:41PM
|