Second Notice | | 5/17/2020 | 5/13/2020 | | DONE |
|
|
|
This permit finaled on the web by Nate Walrath
|
First Notice | | 4/9/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
Telephone call | | | 3/30/2020 | | DONE |
|
|
|
email Cof O to-Nate Walrath
|
Permanent Occupancy | | | 3/30/2020 | | DONE |
|
|
|
|
BLD-Final | 3/24/2020 | 3/24/2020 | 3/24/2020 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Final | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | NR |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Final | 3/17/2020 | 3/18/2020 | 3/18/2020 | A | DEFR |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Final | 3/17/2020 | 3/17/2020 | 3/17/2020 | P | DEFR |
Jim Storey
|
|
|
Mike Phone #: ###-#### out of time set for 3/18
|
FIRE-Final Inspection | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection is complete, signature card not available at time of inspection.
Mike Phone #: ###-####
|
FIRE-Final Inspection | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | CANC |
Jim Page
|
|
|
Rescheduled for 17MAR2020 per conversation with point of contact, this request is cancelled.
Mike Phone #: ###-####
|
FIRE-Conference | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Call ahead // Mike Phone #: ###-####
|
FIRE-Conference | 1/14/2020 | 1/15/2020 | 1/15/2020 | A | CANC |
Jim Page
|
|
|
Conference anceled per voicemail from point of contact, will be rescheduled for a later date.
call prior mike Phone #: ###-####
|
FIRE-Final Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | CANC |
Troy Cobbley
|
|
|
Mike- code reference on the drawings , PLEASE TAKE A LOOK Phone #: ###-####
|
FIRE-Final Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | FAIL |
Jim Page
|
|
|
Door 111 is designated as an exit door with path of travel going from cooler to office area, door 111 needs to swing with the path of travel, door swing needs to be changed, no other items inspected for life fire safety.
call 30 mins ahead please- Mike Phone #: ###-####
|
BLD-Final | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | NR |
Jim Storey
|
|
|
Mike- wants 30 call before, inform that is not guarantee Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 11/7/2019 | | DONE |
|
|
|
|
Routing - FIRE | 10/8/2019 | 10/10/2019 | 10/24/2019 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case
|
Plan assigned to (JAR) | 12/13/2018 | 12/13/2018 | 10/24/2019 | | DONE |
Julie Romig
|
|
|
10/15 (5 days) - 4th Rev - 1st Rev Comp - Plan Mod Charlie's Produce
|
Permit Ready to Issue | | | 10/24/2019 | | DONE |
|
|
|
**PLAN MOD - DO NOT REISSUE**
|
Routing - PLAN CHECK | 10/8/2019 | | 10/23/2019 | | PASS |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 4/29/2019 | | 5/7/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 4/29/2019 | 4/29/2019 | 5/3/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - ELECTRICAL | 4/29/2019 | | 5/3/2019 | | PASS |
Javier Guzman
|
|
|
|
FIRE-Conference | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete, egress paths discussed as well as the addition of an exit sign and two being removed.
John Phone #: ###-####
|
Routing - ELECTRICAL | 3/4/2019 | | 3/13/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 3/4/2019 | 3/4/2019 | 3/8/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - MECHANICAL | 3/7/2019 | | 3/8/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 3/4/2019 | | 3/8/2019 | | FAIL |
Julie Romig
|
|
|
|
BLD-Ceiling Grid Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 | P | FAIL |
Jim Storey
|
|
|
front entry // jim Phone #: ###-#### need insulation covered/ end supports of mains// ok to check at final,
|
BLD-Framing/Rough-in | 1/7/2019 | 1/7/2019 | 1/7/2019 | P | PASS |
Jim Storey
|
|
|
back entry // jim Phone #: ###-####
|
Routing - FIRE | 12/18/2018 | 12/18/2018 | 1/3/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed the architect
|
Routing - PLAN CHECK | 12/18/2018 | | 1/3/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - ELECTRICAL | 1/3/2019 | | 1/3/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 12/28/2018 | | 12/28/2018 | | PASS |
Troy James
|
|
|
No changes to the mechanical plans are required at this time.
|
Plan Modification Accepted | | | 12/13/2018 | | DONE |
|
|
|
adding new doors, showing updated loaction of banana rooms, showing location of banana room doors, showing updated location of electronic equipment/panels; relocating non-load bearing walls, updating location of trash compacter
|
FIRE-Final Inspection | 10/22/2018 | 10/23/2018 | 10/23/2018 | A | FAIL |
Troy Cobbley
|
|
|
Plans need to be revised and re-approved for the wall layout changes. The path of egress will need to be approved for possible exit sign/emergency light layout. Also multiple open rooms in the warehouse area actuall have overhead doors installed and "porthole" type windows mounted that state "emergency exit". The doors/exiting need approved.
Jim Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 10/22/2018 | | DONE |
|
|
|
Per Julie not going to go through with the plan mod. Not going to charge any fees
|
BLD-Framing/Rough-in | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Jim Storey
|
|
|
Jim Phone #: ###-#### entry ok
|
Routing - PLAN CHECK | 9/24/2018 | | 10/1/2018 | | FAIL |
Julie Romig
|
|
|
Plan Mod - 2nd exit required from office
|
Routing - Design Review | 9/24/2018 | | 9/24/2018 | | PASS |
KayCee Babb
|
|
|
Plan Mod to infill existing door with window. Infill shall match exterior materials and color to meet conditions of CZC18-00013.
|
Plan Modification Accepted | | | 9/21/2018 | | DONE |
|
|
|
Converting existing vestibule in office portion of building into office space
|
BLD-Ceiling Grid Inspection | 8/29/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Mike Phone #: ###-####
|
BLD-Conference | 8/14/2018 | 8/14/2018 | 8/15/2018 | P | PASS |
Jim Storey
|
|
|
Tim-bolts that will be comvered in concrete Phone #: ###-#### si
|
BLD-Framing/Rough-in | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### exterior loadding dock walls
|
BLD-Foundation | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 7/18/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-#### office walls ok
|
BLD-Footing | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Jim Storey
|
|
|
pouring at 11am -mike Phone #: ###-####
|
BLD-Framing/Rough-in | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
Print Occupancy Form | | | 6/29/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/29/2018 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 4/11/2018 | 4/11/2018 | 6/27/2018 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - 2nd Comp - L3 Charlie's Produce
|
Routing - PLAN CHECK | 6/27/2018 | | 6/27/2018 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/27/2018 | | DONE |
|
|
|
MET
Need
REVISED
GC Form
(close/final out early start BLD18-01337 before issuing this permit)
|
Routing - PLAN CHECK | 6/7/2018 | | 6/18/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 6/7/2018 | 6/7/2018 | 6/13/2018 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case
|
Routing - PLUMBING | 6/7/2018 | | 6/11/2018 | | PASS |
Bill VanDegrift
|
|
|
plans not required for this type of T.I. see submittal checklist.
|
Routing Off Site - STRUCTURAL | 6/7/2018 | | 6/8/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - Design Review | 6/7/2018 | | 6/7/2018 | | PASS |
KayCee Babb
|
|
|
per CZC18-00013. Minor modifications updated in zoning certificate.
|
Route to Impact Fee Review | 5/11/2018 | 5/14/2018 | 5/14/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 5/11/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 4/11/2018 | | 5/11/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 4/11/2018 | 4/11/2018 | 5/10/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing Off Site - STRUCTURAL | 4/11/2018 | | 4/24/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing PW Solid Waste | 4/11/2018 | | 4/19/2018 | | PASS |
Evan Carpenter
|
|
|
Ensure that the final compactor location aligns with the adjacent property so there is a 60 feet straight-line approach in front of the compactor.
|
Routing - MECHANICAL | 4/11/2018 | | 4/13/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 4/11/2018 | | 4/11/2018 | | PASS |
David Moser
|
|
|
See CZC18-00013
|
Routing - Addressing | 4/11/2018 | | 4/11/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/11/2018 | | 4/11/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 4/11/2018 | | 4/11/2018 | | FAIL |
KayCee Babb
|
|
|
Submitted plans and proposed work do not match those provided for CZC18-00013.
|
Routing - PLUMBING | 4/11/2018 | | 4/11/2018 | | FAIL |
Daryl Spivey
|
|
|
State licensed set of stamped plumbing plans required for plumbing review.
|
Routing PW Environmental | 4/11/2018 | | 4/11/2018 | | PASS |
Rick Christenson
|
|
|
per plumbing review
|
Intake Approval | | | 4/10/2018 | | PASS |
|
|
|
|
Intake Approval | | | 4/2/2018 | | FAIL |
Julie Romig
|
|
|
Need 520 submittal checklist and all applicable items as required by checklist.
|
Application received | | | 3/28/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 28 2018 9:55PM
|