BLD-Final | 7/29/2018 | 7/30/2018 | 7/30/2018 | A | PASS |
Mike Jordan
|
|
|
Shed is in the backyard on the south side of the property. Access can be obtained through the large gate of the south side of the property. No dogs will be in the backyard. Thank you! Phone #: ###-#### Inspection requested via web by Teresa Wood-Adams
|
BLD-Framing/Rough-in | 7/30/2018 | 7/30/2018 | 7/30/2018 | A | PASS |
Mike Jordan
|
|
|
Shed is in the backyard on the south side of the property. Access can be obtained through the large gate of the south side of the property. No dogs will be in the backyard. Thank you! Phone #: ###-#### Inspection requested via web by Teresa Wood-Adams
|
DOC - Permit Finaled | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Footing | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Mike Jordan
|
|
|
inspection site is behind large gate on gravel side of property. Gate will be left open for inspection. No animals in yard. Other contact number ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Teresa Wood-Adams
|
OVERRIDE | | | 6/15/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 6/15/2018 | 6/15/2018 | 6/15/2018 | A | DONE |
Sue Cummings
|
|
|
lowered height to get reduced setbacks
|
Routing Walk-In (BLD) | 6/15/2018 | 6/15/2018 | 6/15/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/15/2018 | | 6/15/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/15/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/15/2018 | | DONE |
|
|
|
all met
|
Issue PAID IN FULL permit | | | 6/15/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 3/29/2018 | 3/29/2018 | 3/29/2018 | A | FAIL |
Sue Cummings
|
|
|
Doesn't meet setbacks
|
Routing Walk-In (BLD) | 3/29/2018 | 3/29/2018 | 3/29/2018 | A | FAIL |
Josh Bogle
|
|
|
discussed info needed for application - JAB
|
Routing - PLAN CHECK | 3/29/2018 | | 3/29/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 3/29/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 3/29/2018 | | | |
|
|
|
|