Third Notice | | 12/18/2018 | 1/7/2019 | | DONE |
|
|
|
mailed 1-11-19 with follow up letter
|
First Follow up | | | 1/7/2019 | | DONE |
|
|
|
|
Third Notice | | 11/11/2018 | 12/13/2018 | | DONE |
|
|
|
mailed 12-14
|
Third Notice | | 10/16/2018 | 11/6/2018 | | DONE |
|
|
|
mailed 11-12
|
Second Notice | | 9/20/2018 | 10/11/2018 | | DONE |
|
|
|
mailed 10-12-18
|
Telephone call | | | 9/19/2018 | | DONE |
|
|
|
Left a message for Chris in regards to not having the over all project value on final value sheet and to double check trades since they are much lower then given from trade contractors
|
First Notice | 8/27/2018 | 8/27/2018 | 9/10/2018 | | DONE |
Jim Storey
|
|
|
mailed 9-11-18
|
BLD-Final | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PASS |
Jim Storey
|
|
|
Chris Phone #: ###-####
|
DOC - Permit Finaled | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | NR |
Jim Storey
|
|
|
Chris Phone #: ###-####
|
FIRE-Final Inspection | 7/27/2018 | 7/30/2018 | 7/30/2018 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, final life fire safety inspection for vanilla space complete, NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT as stated in the permit details. A seperate permit is required for the tenant to occupy space.
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PASS |
Jim Storey
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | DEFR |
Jim Storey
|
|
|
Chris Phone #: ###-#### out of time
|
Meeting | | | 5/1/2018 | | DONE |
|
|
|
at the time Chris picked up his building permit i told him he would need all sub permits per the plan reviewer-i told him there will be issues when the 1st c of o is issued for the building if they are not completed per plans
|
Inspection Record Card- Bld | | | 5/1/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 4/9/2018 | 4/9/2018 | 4/30/2018 | | DONE |
Brian McGowan
|
|
|
Needs DR corrections - 4/09 L1 Vanilla Shell T.I. ePlan**
|
Routing - PLAN CHECK | 4/30/2018 | | 4/30/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/30/2018 | | DONE |
|
|
|
NEED
GC FORM
REVISED VALUE
|
Routing - Design Review | 4/25/2018 | | 4/25/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 4/25/2018 | | 4/25/2018 | | FAIL |
Brian McGowan
|
|
|
Did not update Code references.
|
Route to Impact Fee Review | 4/20/2018 | 4/23/2018 | 4/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 4/20/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/3/2018 | | 4/20/2018 | | FAIL |
Brian McGowan
|
|
|
See DR requirements and update Code Design Criteria
|
Plan assigned to (JG) | 4/3/2018 | 4/3/2018 | 4/9/2018 | | DEFR |
Javier Guzman
|
|
|
4/09 L1 Vanilla Shell T.I. ePlan**
|
Routing - Addressing | 4/3/2018 | | 4/4/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/3/2018 | | 4/4/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 4/3/2018 | | 4/3/2018 | | FAIL |
Katelyn Menuge
|
|
|
Need Zoning Certificate for door infill.
|
Intake Approval | | | 4/3/2018 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 3/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 29 2018 3:26PM
|