BLD-Blower Door Test Results | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | DONE |
Tony Young
|
|
|
kelly ###-####// 4.7
|
DOC - Permit Finaled | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Tony Young
|
|
|
kelly ###-####
|
PubWorks Occupancy Approval | 11/30/2018 | 11/30/2018 | 11/30/2018 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department.
|
BLD-Final | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | PEND |
Tony Young
|
|
|
Kelly Stover Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Final | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | NR |
Tony Young
|
|
|
Kelly Stover Phone #: ###-#### Inspection requested via web by Kelly Stover,, needs hillside 1st,, blower door test,, all else ok
|
BLD-Framing/Rough-in | 9/7/2018 | 9/7/2018 | 9/7/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Framing/Rough-in | 9/6/2018 | 9/7/2018 | 9/7/2018 | A | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Framing/Rough-in | 9/5/2018 | 9/6/2018 | 9/6/2018 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover,, need to brace truss # D03, D04 and D07 per engineering,, need to nail off single truss T braces at 6" o. c. min.
|
BLD-Energy code compliance | 9/5/2018 | 9/6/2018 | 9/6/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD-Framing/Rough-in | 8/30/2018 | 8/31/2018 | 8/31/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover,, ok to insulate walls,, see paint notes, (truss bracing, fire blocks, strap, nail braces at 6" o.c.), needs fire sprinklers passed prior to cover,, work in progress on soffits
|
BLD-Framing/Rough-in | 8/29/2018 | 8/31/2018 | 8/30/2018 | P | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Stover Inspection cancelled from web by: Kelly Stover
|
BLD-Wall Bracing | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PASS |
Jim Sly
|
|
|
Johnny Phone #: ###-####
|
BLD-Foundation | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | PART |
Tony Young
|
|
|
Matt Phone #: ###-####,, work in progress,, ok
|
BLD-Footing | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####
|
PubWorks Subgrade Approval | 6/15/2018 | 6/15/2018 | 6/15/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 5/2/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 4/5/2018 | 4/5/2018 | 5/2/2018 | | DONE |
Rob Patrick
|
|
|
4/24 sfd L2 ePlan..4/26 Failed: Need tall wall engineering and update details
|
Issue PAID IN FULL permit | | | 5/2/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/2/2018 | | 5/2/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 5/2/2018 | | DONE |
|
|
|
|
1st review completed | | | 4/26/2018 | | FAIL |
Rob Patrick
|
|
|
4/26...Failed: Need engineering cals for tall wall and update details
|
Routing - PLAN CHECK | 4/5/2018 | | 4/26/2018 | | FAIL |
Rob Patrick
|
|
|
4/26...Failed: Need tall wall engineering calcs and update details
|
Routing PW Grading-Hillside | 4/5/2018 | | 4/19/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - FIRE | 4/5/2018 | 4/5/2018 | 4/16/2018 | | PASS |
Erika Akin
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Routing - Erosion and Sediment | 4/5/2018 | | 4/10/2018 | | PASS |
Andy J. Long
|
|
|
Per Attached ESC Conditions. ESC plan approved. Install BMPs on site map prior to excavation. Site preparation inspection is REQUIRED.
|
Routing - MECHANICAL | 4/5/2018 | | 4/9/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 4/5/2018 | 4/8/2018 | 4/6/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 4/5/2018 | | 4/6/2018 | | PASS |
Nicolette Womack
|
|
|
A 3’ landscape buffer is required along the side property line abutting the right of way.
|
Routing - Addressing | 4/5/2018 | | 4/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/5/2018 | | 4/5/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/5/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/5/2018 | | PASS |
|
|
|
|
Intake Approval | | | 4/3/2018 | | FAIL |
|
|
|
see checklist corrections
|
Application received | | | 3/30/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 30 2018 6:53AM
|