Letter of compliance/Occupancy | | | 6/18/2018 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/18/2018 | | DONE |
|
|
|
|
BLD-Final | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | PASS |
Brandon Shaw
|
|
|
Please call ahead for access - Daniel Phone #: ###-####
|
DOC - Permit Finaled | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 5/21/2018 | 5/22/2018 | 5/22/2018 | P | FAIL |
Brandon Shaw
|
|
|
Provide proper egress landings/stairs at front and rear entry ways.
|
BLD-Foundation | 5/21/2018 | 5/22/2018 | 5/22/2018 | P | PASS |
Brandon Shaw
|
|
|
Daniel Phone #: ###-####
|
BLD-Footing | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
Issue PAID IN FULL permit | | | 4/19/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/9/2018 | | DONE |
Christina Prado
|
|
|
NEED ****IN MIS. DRAWER****
RP - Homeowner RP
Make sure BLD18-00528 is final first
|
Telephone call | | | 4/9/2018 | | DONE |
|
|
|
Left a message for Dan informing him of the fees due for this permit, need an RP and the demo will need to have a passing final inspection before this one can be issued
|
Plan assigned to (JAB) Josh | 4/2/2018 | 4/2/2018 | 4/6/2018 | | PASS |
Josh Bogle
|
|
|
1st done - foundation under Manufactured Home, need a foundation plan - Planning failed
|
Routing - PLAN CHECK | 4/6/2018 | | 4/6/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/6/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2018 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLANNING | 4/5/2018 | | 4/5/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PLAN CHECK | | | 4/4/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 4/4/2018 | | FAIL |
Josh Bogle
|
|
|
|
Route to Impact Fee Review | 3/30/2018 | 4/2/2018 | 4/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | | | 4/2/2018 | | PASS |
|
|
|
credit for demo. already billing.
|
Routing - Addressing | 4/2/2018 | | 4/2/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/2/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/2/2018 | | PASS |
|
|
|
no fees taken at intake
|
Recd Pcfee & Taken To Pln CK | | | 4/2/2018 | | DONE |
|
|
|
no fees paid at intake
|
Application received | | 3/30/2018 | | | |
|
|
|
|
Routing - PLANNING | 4/1/2018 | | | | FAIL |
|
|
|
Will need to revise site plan to show driveway and 2 parking spaces.
|