Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-01125
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 6720 W ASHLAND DR
Project NameChris Brevick PV
Customer Number 
ePlanReviewYes
Description
MODIFICATION TO ELECTRICAL ONE-LINE (PP 5) **jab** Permit for 175sq' of roof-mounted, grid-tied Photo-voltaic panels with optimizers; 10 panels in 2 arrays. No work needed to strengthen the existing roof structure per engineer’s roof evaluation. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/23/20185/24/20185/24/2018PDONE
DetailsMike Jordan
Chris Brevick, homeowner: 2083773094 Phone #: ###-#### Inspection requested via web by BRS Permitting
DOC - Permit Finaled5/24/20185/24/20185/24/2018PPASS
DetailsMike Jordan
BLD-Final5/18/20185/21/20185/18/2018PCANC
DetailsMike Jordan
Chris Brevick, homeowner: 2083773094 Phone #: ###-#### >> Inspection requested via web by BRS Permitting Inspection cancelled from web by: BRS Permitting
CHANGE STATUS TO (ISS)  5/15/2018 DONE
Plan assigned to (JAB) Josh5/9/20185/9/20185/14/2018 PASS
DetailsJosh Bogle
modification
Routing - PLAN CHECK5/11/2018 5/14/2018 PASS
DetailsJosh Bogle
Permit Ready to Issue  5/14/2018 DONE
Plan Mod Approved
DO NOT REISSUE
Plan Modification Accepted  5/9/2018 DONE
electrical revision per contractor request
Issue PAID IN FULL permit  4/23/2018 DONE
Inspection Record Card- Bld  4/23/2018 DONE
Plan assigned to (JAB) Josh3/30/20183/30/20184/11/2018 PASS
DetailsJosh Bogle
1st done - need roof structure info
Routing - PLAN CHECK4/11/2018 4/11/2018 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  4/11/2018 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  4/11/2018 DONE
Routing - PLAN CHECK3/30/2018 4/3/2018 FAIL
DetailsJosh Bogle
1st review completed  4/3/2018 FAIL
DetailsJosh Bogle
Application received  3/30/2018 DONE
Application submitted via PDS Online on Mar 30 2018 2:59PM
Plans ACCEPTED BY PLAN TECH  3/30/2018 DONE
Recd Pcfee & Taken To Pln CK  3/30/2018 DONE
no intake fee taken, 406
Intake Approval  3/30/2018 PASS
Routing - PLANNING3/30/2018 3/30/2018 PASS
DetailsSue Cummings