Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-01126
StatusIssued
Name ST LUKES HEALTH SYSTEM LTD
Site Address 190 E BANNOCK ST
Project NameEP Lab Remodel - 3rd story
Customer Number 
ePlanReviewYes
Description
(ST. LUKE’S – ELECTROPHYSIOLOGY (EP) LAB – 3RD STORY – NORTHWEST OF SOUTH WING) The fire sprinkler system is used for high rise and for occupancy. Demolition work within the existing Electrophysiology (EP) Lab includes removing existing medical equipment, Unistrut ceiling support grid, casework, wall coverings, floor coverings, interior walls, suspended acoustical ceilings, furniture, and cabinets. To remodel the existing Electrophysiology (EP) Lab on the 3rd story of St. Luke’s Hospital located just Northwest of the South Wing. The remodeled lab will have a floor area of about 1,250 square feet (about 286 square feet smaller than before). The new medical equipment has both floor-mounted components and components suspended from the ceiling. Work is to include floor mounting plates attached with through-bolts to the existing 4” concrete floor slab to support new floor mounted equipment, a ceiling plate hung from the floor above using expansion anchors to support the new power boom, a new Unistrut support grid hung from the floor above using expansion anchors and having diagonal lateral load bracing elements used to support new suspended medical equipment, a new door in the wall of an I-2 rated corridor that is also a care suite wall, a new cased opening in an existing wall where the concrete floor is continuous through the opening, new interior walls, new lead shielding, new interior doors, suspended acoustical ceilings, cabinets, furred walls, medical equipment, and finishes. The existing medical gas system will also be altered. Holes will be core drilled through the floor of the 3rd story. Some cabinet work will also be done within the cine viewing room located on the 3rd story of the South Wing. While transporting the old and new medical equipment through the building and while staging for installation, floors and elevators are not allowed to be overloaded. Special Inspection is required for anchors post-installed in hardened concrete. The installation and use of X-ray equipment, including shielding at new and existing walls, is required to comply with all applicable Industry, State, and Federal regulations. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 (including quick-response heads installed within the remodeled areas) and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/8/201810/8/201810/8/2018PPASS
DetailsDave Hannah
Daryl Phone #: ###-####
FIRE-Final Inspection10/4/201810/5/201810/5/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.

Daryl Phone #: ###-####
BLD-Ceiling Grid Inspection8/31/20189/4/20189/4/2018APASS
DetailsDave Hannah
Kelly Phone #: ###-####
Issue PAID IN FULL permit  5/10/2018 DONE
Print Occupancy Form  5/10/2018 DONE
Route to Impact Fee Review4/21/20184/24/20184/23/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Permit Ready to Issue  4/23/2018 DONE
Need
GC Form
Revised Cert of Value
Plan assigned to (CJW)4/3/20184/3/20184/21/2018 PASS
DetailsCarl Westfall
(Apr 11 - 7 days) (29 sheets) L2 ST. LUKES 3 CENTRAL EP LAB REMODEL ePlan
Routing - PLAN CHECK4/3/2018 4/21/2018 PASS
DetailsCarl Westfall
1st review completed  4/21/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/21/2018 DONE
Routing Off Site - STRUCTURAL4/3/2018 4/17/2018 PASS
DetailsCarl Westfall
Dave Haugland (AHJ)
Routing - FIRE4/3/20184/3/20184/11/2018 PASS
DetailsErika Akin
Attached comments to case
Routing PW Environmental4/3/2018 4/6/2018 PASS
DetailsRick Christenson
Routing - MECHANICAL4/3/2018 4/4/2018 PASS
DetailsTroy James
Routing - PLUMBING4/3/2018 4/4/2018 PASS
DetailsBill VanDegrift
must have legible plans on site.
Routing - PUBLIC WORKS4/3/2018 4/4/2018 PASS
DetailsMorgan Webb
Routing - Addressing4/3/2018 4/3/2018 PASS
DetailsDoug Chausow
Intake Approval  4/3/2018 PASS
DetailsJavier Guzman
Application received  3/30/2018 DONE
Application submitted via PDS Online on Mar 30 2018 3:29PM