Third Notice | | 8/18/2019 | 9/18/2019 | | DONE |
|
|
|
mailed 9-19-19 with third and final follow up letter
|
Third Follow up | | | 9/18/2019 | | DONE |
|
|
|
final
|
Third Notice | | 7/15/2019 | 8/13/2019 | | DONE |
|
|
|
mailed 8-13 with second follow up
|
Second Follow up | | | 8/13/2019 | | DONE |
|
|
|
|
Third Notice | | 6/12/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11 with first follow up
|
First Follow up | | | 7/10/2019 | | DONE |
|
|
|
|
Third Notice | | 5/11/2019 | 6/7/2019 | | DONE |
|
|
|
mailed 6-10
|
Second Notice | | 4/18/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
First Notice | 4/5/2019 | 4/5/2019 | 4/8/2019 | | DONE |
Brandon Shaw
|
|
|
mailed 4/11
|
BLD-Final | 4/3/2019 | 4/4/2019 | 4/5/2019 | A | PASS |
Brandon Shaw
|
|
|
Call for access- Eric Phone #: ###-####
|
DOC - Permit Finaled | 4/5/2019 | 4/5/2019 | 4/5/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Foundation | 3/4/2019 | 3/6/2019 | 3/6/2019 | P | PASS |
Mike Jordan
|
|
|
Rebar-Will be ready for inspection at 1pm- call Erik Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/13/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/13/2018 | | DONE |
|
|
|
|
Expiration Notice | 9/4/2018 | 9/25/2018 | 9/4/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 7/11/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 4/16/2018 | 4/16/2018 | 7/11/2018 | | DONE |
Brian McGowan
|
|
|
Maverick Towers New Due 5/30 - Fail- structural and DR
|
Routing Off Site - STRUCTURAL | 7/11/2018 | | 7/11/2018 | | PASS |
Brian McGowan
|
|
|
As per Ena Beganovic of AHJ.
|
Routing - PLAN CHECK | 7/11/2018 | | 7/11/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/11/2018 | | DONE |
|
|
|
NEED
REVISED VALUE (waiting for second page blh 9/12/18 8am)
MET
RP
GC FORM
|
Routing - Design Review | 6/7/2018 | | 6/7/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Route to Impact Fee Review | 5/23/2018 | 5/26/2018 | 5/24/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 4/16/2018 | 4/16/2018 | 5/24/2018 | | PASS |
Erika Akin
|
|
|
No comments attached. Inspector to field verify a fire extinguisher within 75 feet.
|
Routing Off Site - STRUCTURAL | 4/16/2018 | | 5/23/2018 | | FAIL |
Brian McGowan
|
|
|
See requested corrections.
|
Routing - PLAN CHECK | 4/16/2018 | | 5/23/2018 | | FAIL |
Brian McGowan
|
|
|
Structural corrections and DR requirements.
|
1st review completed | | | 5/23/2018 | | FAIL |
Brian McGowan
|
|
|
Structural corrections and DR requirements.
|
Routing - Erosion and Sediment | 4/16/2018 | | 4/17/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver approved. Contractor required to act as RP.
|
Routing PW Drainage | 4/17/2018 | | 4/17/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 4/16/2018 | | 4/17/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/16/2018 | | 4/16/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 4/16/2018 | | 4/16/2018 | | PASS |
Susan Riggs
|
|
|
|
Intake Approval | | | 4/16/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/16/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/16/2018 | | DONE |
|
|
|
|
Routing - Design Review | 4/16/2018 | | 4/16/2018 | | FAIL |
Katelyn Menuge
|
|
|
Fence fabric is not allowed, vinyl slats can be approved. Barbed wire is not allowed in the zone.
|
Application received | | | 4/2/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 2 2018 8:35AM
|