Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD18-01132
StatusFinaled
Name BUSALACCHI CUSTOM HOMES LLC
Site Address 1213 S ROOSEVELT ST
Project Name1213 S. Roosevelt lot 1 blk 1
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 1811 sq. ft., two story (first story 897 sq. ft., second story 914 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 38 sq. ft. of covered patio/porch and a 488 sq. ft. attached garage per the approved plans, plan review report and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/9/20191/10/20191/10/2019APASS
DetailsJim Sly
Sean Phone #: ###-####
Blower Door test......3.6
DOC - Permit Finaled1/10/20191/10/20191/10/2019PPASS
DetailsJim Sly
BLD-Final11/19/201811/20/201811/20/2018ANR
DetailsJim Sly
code for garage code- Shawn Phone #: ###-####
No Driveway
BLD-Energy code compliance7/30/20187/31/20187/31/2018APASS
DetailsJim Sly
framing and insulation // Shawn Phone #: ###-####
BLD-Framing/Rough-in7/20/20187/23/20187/23/2018APART
DetailsJim Sly
Shawn Phone #: ###-####
C/N ....6" at winder tread. OK to insulate.....Shear inspection approved.
BLD-Wall Bracing7/18/20187/19/20187/19/2018APASS
DetailsJim Sly
Shawn Phone #: ###-####
Plan Modification Accepted  7/11/2018 DONE
new manual j report
Routing - MECHANICAL7/11/2018 7/11/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Foundation5/22/20185/23/20185/23/2018PPASS
DetailsJim Sly
Phone #: 2086971241 >> Inspection requested via mobile web by Heron lira
FOOTING OK.
BLD-Footing5/21/20185/22/20185/23/2018PNR
DetailsJim Sly
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
Issue PAID IN FULL permit  5/4/2018 DONE
Inspection Record Card- Bld  5/4/2018 DONE
OVERRIDE  4/18/2018  
Plan assigned to (RDP)4/5/20184/5/20184/18/2018 DONE
DetailsRob Patrick
4/18 sfd L1 ePlan....4/13 Failed
Routing - PLANNING4/6/2018 4/18/2018 PASS
DetailsTed Vanegas
Routing - PLAN CHECK4/18/2018 4/18/2018 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  4/18/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  4/18/2018 DONE
1st review completed  4/13/2018 FAIL
DetailsRob Patrick
4-13...Failed
Routing - MECHANICAL4/6/2018 4/11/2018 PASS
DetailsChad Schwendiman
Route to Impact Fee Review4/6/20184/9/20184/9/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing4/6/2018 4/6/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/6/2018 4/6/2018 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  4/6/2018 DONE
Recd Pcfee & Taken To Pln CK  4/6/2018 DONE
Intake Approval  4/5/2018 FAIL
Missing
ELEVATIONS
CRAWL/ATTIC ACCESS
Intake Approval  4/5/2018 PASS
Intake Approval  4/4/2018 FAIL
Wrong plans and MJ uploaded. please upload correct plans and MJ
Intake Approval  4/4/2018 FAIL
Missing
ELEVATIONS
CRAWL/ATTIC ACCESS
Application received  4/2/2018 DONE
Application submitted via PDS Online on Apr 2 2018 10:53AM
Routing - PLAN CHECK4/6/2018   FAIL
DetailsRob Patrick
4/13...Failed