BLD-Final | 3/25/2019 | 3/26/2019 | 3/26/2019 | A | NR |
Mike Jordan
|
|
|
Swimming Pool Final Inspection Phone #: ###-#### Inspection requested via web by Brandy McConkey. Still need electrical final prior to bldg. final.
|
BLD-Other | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Mike Jordan
|
|
|
Mike: Swimming Pool Rebar/Steel/Pre-shotcrete Structural Re-Inspection Phone #: ###-#### Inspection requested via web by Brandy McConkey. Issues have been resolved. ok to shot crete pool.
|
BLD-Footing | 4/30/2018 | 5/3/2018 | 5/3/2018 | A | FAIL |
Mike Jordan
|
|
|
Rebar/ pre-shotcrete inspection Phone #: ###-#### Inspection requested via web by Brandy McConkey. Pool does not meet the required min. setback at rear property line. Called above number and left message. Correction notice posted.
|
OVERRIDE | | | 4/3/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 4/3/2018 | 4/3/2018 | 4/3/2018 | P | PASS |
KayCee Babb
|
|
|
|
Routing Walk-In (BLD) | 4/3/2018 | 4/3/2018 | 4/3/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/3/2018 | | 4/3/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 4/3/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/3/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/3/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/3/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/3/2018 | | DONE |
|
|
|
|
Application received | | 4/3/2018 | | | |
|
|
|
|