(COSTCO – BAKERY REMODEL) Permit to remodel in the bakery area within an existing 160,471 sq. ft. mercantile store by replacing existing ovens with new ovens. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of (3) ovens, removal of (1) proofer, removal of select FRP wall paneling, removal of select suspended acoustic ceiling, installation of (4) ovens, installation of (1) proofer, installation of select FRP wall paneling, installation of select suspended acoustic ceiling, electrical work, plumbing work and mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/20/20187/23/20187/23/2018PPEND
DetailsJim Sly
Kevin- Phone #: ###-####
OK to sign off when Permit and Final for plumbing is compleyed and CDHD approved.
FIRE-Final Inspection7/20/20187/23/20187/23/2018APASS
DetailsTroy Cobbley
Life safety passed. No alarm or sprinkler work.


Kevin- won''t be in town until 930am Phone #: ###-####
BLD-Final7/17/20187/20/20187/20/2018PNR
DetailsMike Jordan
Kevin Ezell--prefers mid morning Phone #: ###-####
Issue PAID IN FULL permit  4/25/2018 DONE
Inspection Record Card- Bld  4/25/2018 DONE
Plan assigned to (JG)4/5/20184/5/20184/19/2018 PASS
DetailsJavier Guzman
4/18 L2 Costco Wholesale Bakery Upgrade ePlan**
Routing - PLAN CHECK4/5/2018 4/19/2018 PASS
DetailsJavier Guzman
Routing Off Site - C.D.H4/5/2018 4/19/2018 PASS
DetailsJavier Guzman
signed off in ePlan by Central District Health Department Will Reynolds
1st review completed  4/19/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  4/19/2018 DONE
Permit Ready to Issue  4/19/2018 DONE
MET-Need
GC Form-MET
Revised Cert of Value-MET
Routing - MECHANICAL4/5/2018 4/11/2018 PASS
DetailsChad Schwendiman
Routing PW Environmental4/5/2018 4/6/2018 PASS
DetailsRick Christenson
Intake Approval  4/5/2018 PASS
DetailsJavier Guzman
Routing - PLUMBING4/5/2018 4/5/2018 PASS
DetailsBill VanDegrift
additional cross connection protection may be required
Routing - Addressing4/5/2018 4/5/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/5/2018 4/5/2018 PASS
DetailsMorgan Webb
Application received  4/3/2018 DONE
Application submitted via PDS Online on Apr 3 2018 2:31PM