BLD-Final | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PASS |
Jim Sly
|
|
|
code for garage code- Shawn Phone #: ###-#### Blower door.......3.7
|
DOC - Permit Finaled | 11/20/2018 | 11/20/2018 | 11/20/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | DONE |
Jim Sly
|
|
|
per Jim Sly-call neighbor Melissa when on way to conference with GC ###-####
|
BLD-Conference | 9/27/2018 | 9/28/2018 | 9/28/2018 | A | CANC |
Jim Sly
|
|
|
neighbor has concerns that the retaining wall is not done correctly or to code-can you please check on it Could not meet with owner-
|
BLD-Energy code compliance | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Jim Sly
|
|
|
Shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Jim Sly
|
|
|
Shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 7/13/2018 | 7/16/2018 | 7/16/2018 | A | FAIL |
Mike Jordan
|
|
|
Shawn Phone #: ###-####. Nail off simpson hangars in garage. Provide tempered glazing at window bottom of stairs. Fire block flue cahse 2nd floor ceiling. fireblock 1st floor ceiling at mech chase. Aslo had contractor remove portions of tyvek to spot check wall bracing and verified all blocking. Correction notice posted. Ok to insulate.
|
Plan Modification Accepted | | | 7/11/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 7/11/2018 | | 7/11/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Conference | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | DONE |
Jim Sly
|
|
|
Check back to see if string pulled. Contractor pulled line on East side of house. Fondation wall at 5' 1 1/4 " from property line.....OK.
|
BLD-Conference | 5/24/2018 | 5/24/2018 | 5/25/2018 | P | PEND |
Jim Sly
|
|
|
complaint please verify setbacks. Says foundations for 4208 & 4212 Teton are closer than 5' to property line. Called Contractor. Told him to Pull string line on East side. as of 5/25 2:40 PM not done yet. Will check on Tues.
|
BLD-Foundation | 5/22/2018 | 5/23/2018 | 5/23/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron lira
|
BLD-Footing | 5/21/2018 | 5/22/2018 | 5/23/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
|
Inspection Record Card- Bld | | | 5/4/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/4/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 4/20/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 4/5/2018 | 4/5/2018 | 4/20/2018 | | DONE |
Rob Patrick
|
|
|
4/18 sfd L1 ePlan....4/19 Failed: Needs to update CS-PF detail
|
Routing - PLAN CHECK | 4/20/2018 | | 4/20/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/20/2018 | | DONE |
|
|
|
|
1st review completed | | | 4/19/2018 | | FAIL |
Rob Patrick
|
|
|
4/19....Failed: Needs to update CS-PF detail
|
Routing - PLANNING | 4/5/2018 | | 4/18/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - MECHANICAL | 4/5/2018 | | 4/9/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 4/5/2018 | 4/8/2018 | 4/6/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 4/5/2018 | | 4/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/5/2018 | | 4/5/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/5/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/5/2018 | | DONE |
|
|
|
|
Application received | | | 4/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 4 2018 10:08AM
|
Intake Approval | | | 4/4/2018 | | FAIL |
|
|
|
update the code year to 2015 IRC codes and please provide a stair section showing the dimensions of treads, risers, headroom, handrails and guard requirements.
|
Routing - PLAN CHECK | 4/5/2018 | | | | FAIL |
Rob Patrick
|
|
|
|