Permit Information
Permit NumberBLD18-01162
StatusFinaled
Name VANDALAY HOMES LLC
Site Address 5330 N FARROW ST
Project NameJohnson additions
Customer Number 
ePlanReviewNo
Description
Permit for a full gut-to-the-studs remodel that includes adding 2,228sq' of living space, 849sq' of garage, & 430sq' of covered porch. Final home is 7Bd/4.5Bth. All work per plans, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/7/20198/8/20198/8/2019APASS
DetailsTell Riley
Steven Phone #: ###-####//platforms added under egress windows for code compliance//bedroom that is not code compliant is boarded up--not readily accessible and will require sufficient effort to access//bonus room addition is boarded up and not readily accessible--and will require significant effort to access//plan modification will need to be provided and approved to use space that is boarded off//these areas will need inspection prior to approved use//
DOC - Permit Finaled8/8/20198/8/20198/8/2019PPASS
DetailsTell Riley
BLD-Final8/5/20198/5/20198/5/2019PFAIL
DetailsTell Riley
Steven Phone #: ###-####//correction notice issued//added space above garage is not on the plans and does not have stair or ramp access//midlevel room does not meet code requirements for bedroom// lower level bedrooms egress windows are to high//
BLD-Final8/2/20198/2/20198/2/2019PFAIL
DetailsTell Riley
Steven Phone #: ###-####//talked to electrical inspector--inspection failed//need plumbing final as well// will need to look into bedroom with low ceiling height-and play room in bonus area///
BLD-Final5/29/20195/29/20195/29/2019PDONE
DetailsJim Sly
Steven Phone #: ###-####
Walk thru with Steve........
BLD-Energy code compliance11/14/201811/15/201811/15/2018APASS
DetailsJim Sly
Steven Phone #: ###-####
BLD-Framing/Rough-in11/8/201811/13/201811/13/2018APASS
DetailsJim Sly
Steven Phone #: ###-####
Plan Modification Accepted  10/30/2018 DONE
New manual j report
Routing - MECHANICAL10/30/2018 10/30/2018 PASS
DetailsTroy James
Resubmitted manual j report. Homeowner decided to use the existing equipment.
BLD-Conference10/24/201810/24/201810/25/2018PDONE
DetailsJim Sly
Steven Phone #: ###-####
BLD-Conference8/15/20188/15/20188/15/2018PDONE
DetailsJim Sly
Call ahead with a rough time of meeting there // Steven Phone #: ###-####
OVERRIDE  7/13/2018  
Plan assigned to (JAB) Josh4/4/20184/4/20187/13/2018 PASS
DetailsJosh Bogle
1st done - see e-mail 4/6
Routing - PLAN CHECK7/13/2018 7/13/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  7/13/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  7/13/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  7/13/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  7/13/2018 DONE
Issue PAID IN FULL permit  7/13/2018 DONE
Plan resubmittals received  6/29/2018 DONE
received two new full sets of plans; taken to JAB
Routing - PLAN CHECK5/18/2018 5/18/2018 FAIL
DetailsJosh Bogle
Plan resubmittals received  5/17/2018 DONE
received 2 sets of sheets A-1.1, A-1.5, A-1.6, A-1.8, A-1.9, A-1.10 & TOOK TO jab
Routing - PLAN CHECK5/9/2018 5/9/2018 FAIL
DetailsJosh Bogle
Plan resubmittals received  5/3/2018 DONE
DetailsChristina Prado
Received two full new sets of plans maked A-1.1, A-1.2, A-1.3, A-1.4, A-1.5, A-1.6, A-1.7, A-1.8, A-1.9, A-1.10, A-1.11, A-1.12, A-1.13, A-1.14, A-1.15 & S.01; plans stamped and taken to JAB for review
Plan Modification Accepted  4/9/2018 DONE
revised manual J
Routing - MECHANICAL4/9/2018 4/9/2018 PASS
DetailsChad Schwendiman
1st review completed  4/6/2018 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK4/4/2018 4/6/2018 FAIL
DetailsJosh Bogle
Routing - MECHANICAL4/4/2018 4/5/2018 FAIL
DetailsTroy James
emailed manual j
Routing Walk-In (Zoning)4/4/20184/4/20184/4/2018PPASS
DetailsColleen T Carroll
Routing Walk-In (BLD)4/4/20184/4/20184/4/2018PPASS
DetailsJosh Bogle
took in as a level 2
Application received 4/4/2018