BLD-Final | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
Tell Riley
|
|
|
Steven Phone #: ###-####//platforms added under egress windows for code compliance//bedroom that is not code compliant is boarded up--not readily accessible and will require sufficient effort to access//bonus room addition is boarded up and not readily accessible--and will require significant effort to access//plan modification will need to be provided and approved to use space that is boarded off//these areas will need inspection prior to approved use//
|
DOC - Permit Finaled | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | FAIL |
Tell Riley
|
|
|
Steven Phone #: ###-####//correction notice issued//added space above garage is not on the plans and does not have stair or ramp access//midlevel room does not meet code requirements for bedroom// lower level bedrooms egress windows are to high//
|
BLD-Final | 8/2/2019 | 8/2/2019 | 8/2/2019 | P | FAIL |
Tell Riley
|
|
|
Steven Phone #: ###-####//talked to electrical inspector--inspection failed//need plumbing final as well// will need to look into bedroom with low ceiling height-and play room in bonus area///
|
BLD-Final | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | DONE |
Jim Sly
|
|
|
Steven Phone #: ###-#### Walk thru with Steve........
|
BLD-Energy code compliance | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Jim Sly
|
|
|
Steven Phone #: ###-####
|
BLD-Framing/Rough-in | 11/8/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Jim Sly
|
|
|
Steven Phone #: ###-####
|
Plan Modification Accepted | | | 10/30/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 10/30/2018 | | 10/30/2018 | | PASS |
Troy James
|
|
|
Resubmitted manual j report. Homeowner decided to use the existing equipment.
|
BLD-Conference | 10/24/2018 | 10/24/2018 | 10/25/2018 | P | DONE |
Jim Sly
|
|
|
Steven Phone #: ###-####
|
BLD-Conference | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | DONE |
Jim Sly
|
|
|
Call ahead with a rough time of meeting there // Steven Phone #: ###-####
|
OVERRIDE | | | 7/13/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 4/4/2018 | 4/4/2018 | 7/13/2018 | | PASS |
Josh Bogle
|
|
|
1st done - see e-mail 4/6
|
Routing - PLAN CHECK | 7/13/2018 | | 7/13/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/13/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/13/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 7/13/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/13/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/29/2018 | | DONE |
|
|
|
received two new full sets of plans; taken to JAB
|
Routing - PLAN CHECK | 5/18/2018 | | 5/18/2018 | | FAIL |
Josh Bogle
|
|
|
|
Plan resubmittals received | | | 5/17/2018 | | DONE |
|
|
|
received 2 sets of sheets A-1.1, A-1.5, A-1.6, A-1.8, A-1.9, A-1.10 & TOOK TO jab
|
Routing - PLAN CHECK | 5/9/2018 | | 5/9/2018 | | FAIL |
Josh Bogle
|
|
|
|
Plan resubmittals received | | | 5/3/2018 | | DONE |
Christina Prado
|
|
|
Received two full new sets of plans maked A-1.1, A-1.2, A-1.3, A-1.4, A-1.5, A-1.6, A-1.7, A-1.8, A-1.9, A-1.10, A-1.11, A-1.12, A-1.13, A-1.14, A-1.15 & S.01; plans stamped and taken to JAB for review
|
Plan Modification Accepted | | | 4/9/2018 | | DONE |
|
|
|
revised manual J
|
Routing - MECHANICAL | 4/9/2018 | | 4/9/2018 | | PASS |
Chad Schwendiman
|
|
|
|
1st review completed | | | 4/6/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/4/2018 | | 4/6/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 4/4/2018 | | 4/5/2018 | | FAIL |
Troy James
|
|
|
emailed manual j
|
Routing Walk-In (Zoning) | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2
|
Application received | | 4/4/2018 | | | |
|
|
|
|