BLD-Other | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PASS |
Dave Hannah
|
|
|
basement walls // Tony Phone #: ###-#### home owner will pull permit tpo finish basement
|
DOC - Permit Finaled | 6/12/2018 | 6/12/2018 | 6/12/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Jim Sly
|
|
|
Tony Phone #: ###-####
|
BLD-Concrete | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PART |
Brandon Shaw
|
|
|
South side
|
BLD-Footing | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PART |
Jim Sly
|
|
|
Tony Phone #: ###-#### Select footing OK.
|
OVERRIDE | | | 4/16/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 4/16/2018 | 4/16/2018 | 4/16/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/16/2018 | | 4/16/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/16/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/16/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/16/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | PASS |
Katelyn Menuge
|
|
|
|
Routing Walk-In (BLD) | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | FAIL |
Josh Bogle
|
|
|
I turned Tony away, asking for a structural cut section & engineering at the stairs. Told him energy code would kick in if this is for a finished basement.
|
Routing - PLAN CHECK | 4/4/2018 | | 4/4/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 4/4/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 4/4/2018 | | | |
|
|
|
|