Permit Information
Permit NumberBLD18-01166
StatusIssued
Name OKLAND CONSTRUCTION CO INC
Site Address 1290 W MYRTLE ST
Project NamePioneer Crossing Office Buildi
Customer Number 
ePlanReviewYes
Description
***GREEN TAG -EXPEDITED REVIEW- Project Management- Angie Brosious***5 Story office building that is 125,000sf. Building will have (future) ground level bank tenant and business tenants on all floors. This permit is for the Grading, Drainage, Footing/Foundation and Super Structure. The other portions will be submitted under a separate Shell/Core Permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval6/10/20196/10/20196/10/2019 DONE
DetailsTiffany Lowery
BLD-Footing7/18/20187/20/20187/20/2018APASS
DetailsDave Hannah
Steve Phone #: ###-####
BLD-Foundation7/10/20187/11/20187/12/2018PPASS
DetailsDave Hannah
stem wall- north side-steve Phone #: ###-####
BLD-Foundation7/10/20187/10/20187/10/2018PPEND
DetailsDave Hannah
stem wall-steve Phone #: ###-#### ok after mti signoff
BLD-Footing7/2/20187/3/20187/10/2018APASS
DetailsDave Hannah
Steve--MTI is also inspecting, this is for another part Phone #: ###-####
BLD-Footing7/9/20187/9/20187/9/2018PDONE
DetailsDave Hannah
Steve MTI is inspecting Phone #: ###-####
BLD-Footing7/6/20187/6/20187/6/2018PPASS
DetailsDave Hannah
Steve--MTI will inspect rebar and take concrete samples Phone #: ###-####
BLD-Footing7/2/20187/2/20187/3/2018PPASS
DetailsDave Hannah
Steve--prefer early afteroon Phone #: ###-####
BLD-Footing6/27/20186/27/20186/28/2018PPASS
DetailsDave Hannah
Steve Phone #: ###-####
BLD-Concrete6/25/20186/25/20186/25/2018PPART
DetailsBrandon Shaw
West and South walls, OK pending MTI approval
BLD-Footing6/19/20186/20/20186/20/2018APEND
DetailsDave Hannah
Steve---best if late morning--MtI will be on site to inspect rebar and concrete Phone #: ###-#### ok after mti sign off
BLD-Footing6/14/20186/14/20186/14/2018APASS
DetailsDave Hannah
rebar - Steve Phone #: ###-####
BLD-Other6/12/20186/13/20186/14/2018PCANC
DetailsDave Hannah
rebar - Steve Phone #: ###-####
Issue PAID IN FULL permit  5/15/2018 DONE
Inspection Record Card- Bld  5/15/2018 DONE
OVERRIDE  5/11/2018  
Plan assigned to (CDM)4/18/20184/18/20185/11/2018 PASS
DetailsCarl D Madsen
Pioneer Crossing Office Building
Routing - PLAN CHECK5/5/2018 5/11/2018 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL5/5/2018 5/11/2018 PASS
DetailsCarl D Madsen
Routing - Design Review5/11/2018 5/11/2018 PASS
DetailsSarah Schafer
Approved
PLANS/APPL TAKEN TO FRONT DESK  5/11/2018 DONE
Permit Ready to Issue  5/11/2018 DONE
Routing - Erosion and Sediment5/5/2018 5/10/2018 PASS
DetailsAndy J. Long
Updated ESC site map submitted. ESC site preparation required. Need to designate RP from Okland for permit issue.
Routing - Design Review5/5/2018 5/7/2018 FAIL
DetailsAndrea Tuning
Provide a minimum of 12 bicycle parking spaces on the site. A minimum of 3 of the 12 bicycle parking spaces shall be covered. To comply with the current code, the bicycle parking spaces shall be located a minimum of 50-feet from the main entrance to the building. The space shall also be a minimum of 6-feet long and 2.5-feet wide and have an overhead clearance of 7-feet if covered.
A 4-foot wide aisle is required between rows of bicycle parking spaces or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground. ***There is not a bicycle rack detail. The landscape plan says the detail is on a plan that has not been provided.
Route to Impact Fee Review4/27/20184/30/20184/30/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  4/27/2018 FAIL
Routing Off Site - STRUCTURAL4/18/2018 4/27/2018 FAIL
DetailsCarl D Madsen
Routing PW Geothermal4/18/2018 4/27/2018 PASS
DetailsJon R. Gunnerson
No connection to geothermal heating district. Contact Public Works at ###-#### if wanting to connect onto system.
Routing - FIRE4/18/20184/18/20184/25/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - Erosion and Sediment4/18/2018 4/24/2018 FAIL
DetailsAndy J. Long
Please submit update site plan specific to this phase of Pioneer Crossing. Provide stormwater team contacts and update project dates/construction schedule.
Routing - PLAN CHECK4/18/2018 4/21/2018 FAIL
DetailsCarl D Madsen
Routing PW Solid Waste4/18/2018 4/19/2018 PASS
DetailsEvan Carpenter
Routing PW Drainage4/18/2018 4/19/2018 PASS
DetailsBrian Murphy
PAD FROM PIONEER CROSSING PREVIOUS APPROVAL
Routing PW Street Lights4/18/2018 4/19/2018 PASS
DetailsTom Marshall
Routing PW Sewer Design4/18/2018 4/18/2018 PASS
DetailsDeAnn Brown
Routing - PLANNING4/18/2018 4/18/2018 PASS
DetailsLeon Letson
Drive-Thru approved per CUP17-00097
Routing - PLUMBING4/18/2018 4/18/2018 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - PLANNING4/18/2018 4/18/2018 FAIL
DetailsAndrea Tuning
Provide a minimum of 12 bicycle parking spaces on the site. A minimum of 3 of the 12 bicycle parking spaces shall be covered. To comply with the current code, the bicycle parking spaces shall be located a minimum of 50-feet from the main entrance to the building. The space shall also be a minimum of 6-feet long and 2.5-feet wide and have an overhead clearance of 7-feet if covered.
A 4-foot wide aisle is required between rows of bicycle parking spaces or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground.
Routing - Addressing4/18/2018 4/18/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/18/2018 4/18/2018 PASS
DetailsRachael Beierle
FOUNDATION, GRADING, UTILITIES ONLY. SEWER PERMIT WILL BE ATTACHED TO SHELL AND CORE REVIEW.
Intake Approval  4/18/2018 PASS
DetailsCarl D Madsen
Intake Approval  4/6/2018 FAIL
DetailsBrian McGowan
Please provide the Engineering calculations for the project.
Please provide a Site Plan showing parking stalls with dimensions, number of parking spaces, on site walks, ramps, ramp details and at grade mechanical equipment.
Please submit the SWPP you are referring to provided it is the same and shows the BMPS for the new building.
Application received  4/4/2018 DONE
Application submitted via PDS Online on Apr 4 2018 3:35PM