PubWorks Occupancy Approval | 6/10/2019 | 6/10/2019 | 6/10/2019 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Footing | 7/18/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
BLD-Foundation | 7/10/2018 | 7/11/2018 | 7/12/2018 | P | PASS |
Dave Hannah
|
|
|
stem wall- north side-steve Phone #: ###-####
|
BLD-Foundation | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PEND |
Dave Hannah
|
|
|
stem wall-steve Phone #: ###-#### ok after mti signoff
|
BLD-Footing | 7/2/2018 | 7/3/2018 | 7/10/2018 | A | PASS |
Dave Hannah
|
|
|
Steve--MTI is also inspecting, this is for another part Phone #: ###-####
|
BLD-Footing | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | DONE |
Dave Hannah
|
|
|
Steve MTI is inspecting Phone #: ###-####
|
BLD-Footing | 7/6/2018 | 7/6/2018 | 7/6/2018 | P | PASS |
Dave Hannah
|
|
|
Steve--MTI will inspect rebar and take concrete samples Phone #: ###-####
|
BLD-Footing | 7/2/2018 | 7/2/2018 | 7/3/2018 | P | PASS |
Dave Hannah
|
|
|
Steve--prefer early afteroon Phone #: ###-####
|
BLD-Footing | 6/27/2018 | 6/27/2018 | 6/28/2018 | P | PASS |
Dave Hannah
|
|
|
Steve Phone #: ###-####
|
BLD-Concrete | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | PART |
Brandon Shaw
|
|
|
West and South walls, OK pending MTI approval
|
BLD-Footing | 6/19/2018 | 6/20/2018 | 6/20/2018 | A | PEND |
Dave Hannah
|
|
|
Steve---best if late morning--MtI will be on site to inspect rebar and concrete Phone #: ###-#### ok after mti sign off
|
BLD-Footing | 6/14/2018 | 6/14/2018 | 6/14/2018 | A | PASS |
Dave Hannah
|
|
|
rebar - Steve Phone #: ###-####
|
BLD-Other | 6/12/2018 | 6/13/2018 | 6/14/2018 | P | CANC |
Dave Hannah
|
|
|
rebar - Steve Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/15/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/15/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/11/2018 | | |
|
|
|
|
Plan assigned to (CDM) | 4/18/2018 | 4/18/2018 | 5/11/2018 | | PASS |
Carl D Madsen
|
|
|
Pioneer Crossing Office Building
|
Routing - PLAN CHECK | 5/5/2018 | | 5/11/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 5/5/2018 | | 5/11/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Design Review | 5/11/2018 | | 5/11/2018 | | PASS |
Sarah Schafer
|
|
|
Approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/11/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/5/2018 | | 5/10/2018 | | PASS |
Andy J. Long
|
|
|
Updated ESC site map submitted. ESC site preparation required. Need to designate RP from Okland for permit issue.
|
Routing - Design Review | 5/5/2018 | | 5/7/2018 | | FAIL |
Andrea Tuning
|
|
|
Provide a minimum of 12 bicycle parking spaces on the site. A minimum of 3 of the 12 bicycle parking spaces shall be covered. To comply with the current code, the bicycle parking spaces shall be located a minimum of 50-feet from the main entrance to the building. The space shall also be a minimum of 6-feet long and 2.5-feet wide and have an overhead clearance of 7-feet if covered.
A 4-foot wide aisle is required between rows of bicycle parking spaces or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground. ***There is not a bicycle rack detail. The landscape plan says the detail is on a plan that has not been provided.
|
Route to Impact Fee Review | 4/27/2018 | 4/30/2018 | 4/30/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 4/27/2018 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/18/2018 | | 4/27/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Geothermal | 4/18/2018 | | 4/27/2018 | | PASS |
Jon R. Gunnerson
|
|
|
No connection to geothermal heating district. Contact Public Works at ###-#### if wanting to connect onto system.
|
Routing - FIRE | 4/18/2018 | 4/18/2018 | 4/25/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - Erosion and Sediment | 4/18/2018 | | 4/24/2018 | | FAIL |
Andy J. Long
|
|
|
Please submit update site plan specific to this phase of Pioneer Crossing. Provide stormwater team contacts and update project dates/construction schedule.
|
Routing - PLAN CHECK | 4/18/2018 | | 4/21/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Solid Waste | 4/18/2018 | | 4/19/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 4/18/2018 | | 4/19/2018 | | PASS |
Brian Murphy
|
|
|
PAD FROM PIONEER CROSSING PREVIOUS APPROVAL
|
Routing PW Street Lights | 4/18/2018 | | 4/19/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 4/18/2018 | | 4/18/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing - PLANNING | 4/18/2018 | | 4/18/2018 | | PASS |
Leon Letson
|
|
|
Drive-Thru approved per CUP17-00097
|
Routing - PLUMBING | 4/18/2018 | | 4/18/2018 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 4/18/2018 | | 4/18/2018 | | FAIL |
Andrea Tuning
|
|
|
Provide a minimum of 12 bicycle parking spaces on the site. A minimum of 3 of the 12 bicycle parking spaces shall be covered. To comply with the current code, the bicycle parking spaces shall be located a minimum of 50-feet from the main entrance to the building. The space shall also be a minimum of 6-feet long and 2.5-feet wide and have an overhead clearance of 7-feet if covered.
A 4-foot wide aisle is required between rows of bicycle parking spaces or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground.
|
Routing - Addressing | 4/18/2018 | | 4/18/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/18/2018 | | 4/18/2018 | | PASS |
Rachael Beierle
|
|
|
FOUNDATION, GRADING, UTILITIES ONLY. SEWER PERMIT WILL BE ATTACHED TO SHELL AND CORE REVIEW.
|
Intake Approval | | | 4/18/2018 | | PASS |
Carl D Madsen
|
|
|
|
Intake Approval | | | 4/6/2018 | | FAIL |
Brian McGowan
|
|
|
Please provide the Engineering calculations for the project.
Please provide a Site Plan showing parking stalls with dimensions, number of parking spaces, on site walks, ramps, ramp details and at grade mechanical equipment.
Please submit the SWPP you are referring to provided it is the same and shows the BMPS for the new building.
|
Application received | | | 4/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 4 2018 3:35PM
|