Permit Information
Permit NumberBLD18-01169
StatusFinaled
Name VANTAGE HOMES
Site Address 6201 N PIERCE PARK LN
Project NamePierce Park Spec
Customer Number 
ePlanReviewYes
Description
FLOODPLAIN - Permit for the construction of a new 2765 sq. ft., two story (first story 1868 sq. ft., second story 897 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 722 sq. ft. of covered patio/porch and a 784 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. ***BJM*** NOTE:
Two Elevation Certificates will be required; one prior to any vertical construction, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to occupancy approval. Jason Taylor 208-608-7171
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/9/20191/9/20191/9/2019PPASS
DetailsTony Young
Inspection requested via web by Chad Aland,, c of o issued,, blower door 4.9
DOC - Permit Finaled1/9/20191/9/20191/9/2019PPASS
DetailsTony Young
Elevation Cert Rec'd-Final  1/4/2019 DONE
BLD-Final1/2/20191/3/20191/3/2019AFAIL
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Chad Aland,, c/n not complete
BLD-Final12/31/20181/2/20191/2/2019ANR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Chad Aland,, needs trades x 2,, blower door test results,, seal exterior
BLD-Final12/20/201812/20/201812/20/2018PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Chad Aland,, needs trades,, flood cert
Elevation Cert Rec'd-Final  12/20/2018  
BLD-Energy code compliance9/27/20189/27/20189/27/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Chad Aland
BLD-Framing/Rough-in9/24/20189/24/20189/24/2018PPASS
DetailsBrandon Shaw
OK to insulate
BLD-Wall Bracing9/10/20189/11/20189/11/2018APASS
DetailsBrandon Shaw
John Glick Phone #: ###-####
Elevation Cert Rec'd-Midconst  7/31/2018 DONE
BLD-Footing7/9/20187/9/20187/9/2018PPASS
DetailsTony Young
Manny Phone #: ###-####
Issue PAID IN FULL permit  7/6/2018 DONE
Inspection Record Card- Bld  7/6/2018 DONE
OVERRIDE  6/26/2018  
Plan assigned to (BJM)5/2/20185/2/20186/26/2018 DONE
DetailsBrian McGowan
1st review complete. 5-15 sfd L1 ePlan
Routing - PLAN CHECK6/26/2018 6/26/2018 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  6/26/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  6/26/2018 DONE
Routing - PLAN CHECK6/6/2018 6/6/2018 FAIL
DetailsBrian McGowan
Cannot evaluate concentrated load bearing points or structure without knowing where girder trusses are located.
Routing - PLAN CHECK5/25/2018 5/25/2018 FAIL
DetailsBrian McGowan
1st review completed  5/14/2018 FAIL
DetailsBrian McGowan
Structure issues.
Routing - PLAN CHECK5/2/2018 5/14/2018 FAIL
DetailsBrian McGowan
Structure issues
Routing - MECHANICAL5/2/2018 5/9/2018 PASS
DetailsTroy James
Route to Impact Fee Review5/2/20185/5/20185/3/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing5/2/2018 5/3/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/2/2018 5/3/2018 PASS
DetailsRachael Beierle
Routing PW Flood Plain5/3/2018 5/3/2018 PASS
DetailsJason C. Taylor
NOTE:
Two Elevation Certificates will be required; one prior to any vertical construction, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to occupancy approval. Jason Taylor ###-####
Routing - PLANNING5/2/2018 5/2/2018 PASS
DetailsSue Cummings
Intake Approval  5/2/2018 PASS
Plans ACCEPTED BY PLAN TECH  5/2/2018 DONE
Recd Pcfee & Taken To Pln CK  5/2/2018 DONE
Intake Approval  4/19/2018 FAIL
We need the manual J's up loaded, the drawings are designed in the wrong code year, we are now doing our plan review to 2015 IRC as well as the 2015 energy codes so the plans will need to reflect that. You will either need to incorporate the prescriptive energy code compliance form into the drawings or attach the res-check into the docs folder. Also all drawing must have the bottom right corner left open for our approval stamp so there are a few drawings that need changed. thank you
Application received  4/4/2018 DONE
Application submitted via PDS Online on Apr 4 2018 9:21PM