Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-01171
StatusFinaled
Name HAYDEN HOMES IDAHO LLC
Site Address 12530 W AZURE ST
Project NameWhite Clouds 27/7
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2192 sq. ft., two story (first story 906 sq. ft., second story 1286 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 285 sq. ft. of covered patio/porch and a 480 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance Certificate. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/8/20188/9/20188/9/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by daniel solsman
DOC - Permit Finaled8/9/20188/9/20188/9/2018PPASS
DetailsMike Jordan
BLD-Blower Door Test Results8/9/20188/9/20188/9/2018ADONE
DetailsMike Jordan
4.4ACH @50pa
BLD-Energy code compliance6/22/20186/22/20186/22/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Philip Yates
BLD-Framing/Rough-in6/22/20186/22/20186/22/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Philip Yates
BLD-Framing/Rough-in6/20/20186/20/20186/20/2018PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Philip Yates. Nail 2 ply A03 girder truss per the truss engineering. Install the 4x10 header over door to understairway. Justify the oversized holes in the LVL at 2nd floor framing by stairs. Ok to insulate. Correction noice posted.
BLD-Wall Bracing6/6/20186/7/20186/7/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Philip Yates
BLD-Foundation5/11/20185/14/20185/14/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Footing5/10/20185/11/20185/11/2018APASS
DetailsJim Sly
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
Issue PAID IN FULL permit  5/9/2018 DONE
Inspection Record Card- Bld  5/9/2018 DONE
OVERRIDE  5/7/2018  
Plan assigned to (RDP)4/5/20184/5/20185/7/2018 DONE
DetailsRob Patrick
4/18 sfd L1 ePlan...4/12 Failed: Needs Multiple Corrections.
Routing - PLAN CHECK5/7/2018 5/7/2018 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  5/7/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  5/7/2018 DONE
Routing - MECHANICAL4/30/2018 4/30/2018 PASS
DetailsChad Schwendiman
Routing - PLAN CHECK4/26/2018 4/26/2018 PASS
DetailsRob Patrick
4/26...Waiting for Mechanical ACCA report.
1st review completed  4/12/2018 FAIL
DetailsRob Patrick
Routing - PLAN CHECK4/5/2018 4/12/2018 FAIL
DetailsRob Patrick
4/12 Failed, Multiple Corrections Req'd
Routing - MECHANICAL4/5/2018 4/9/2018 FAIL
DetailsChad Schwendiman
Need to submit an ACCA report for approval
Route to Impact Fee Review4/5/20184/8/20184/6/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Application received  4/5/2018 DONE
Application submitted via PDS Online on Apr 5 2018 8:19AM
Plans ACCEPTED BY PLAN TECH  4/5/2018 DONE
Intake Approval  4/5/2018 PASS
Recd Pcfee & Taken To Pln CK  4/5/2018 DONE
Routing - PLANNING4/5/2018 4/5/2018 PASS
DetailsJeff Lowe
Routing - Addressing4/5/2018 4/5/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/5/2018 4/5/2018 PASS
DetailsRachael Beierle