BLD-Footing | 4/24/2018 | 4/24/2018 | 4/27/2018 | P | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Sean Lamm
|
BLD-Footing | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Sean Lamm
|
PubWorks Subgrade Approval | 4/27/2018 | 4/27/2018 | 4/27/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 4/9/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 4/5/2018 | 4/5/2018 | 4/9/2018 | | PASS |
Josh Bogle
|
|
|
due 4/11 - Hillside pool
|
Routing - PLAN CHECK | 4/5/2018 | | 4/9/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 4/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/9/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/9/2018 | | DONE |
|
|
|
|
Telephone call | | | 4/9/2018 | | DONE |
|
|
|
Spoke with John informing him that this permit is ready, fee amount due, who the RP will be and went over went over the esc permit/ wavier letter
|
Issue PAID IN FULL permit | | | 4/9/2018 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 4/6/2018 | | 4/6/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver approved. Contractor and/or home owner will be RP.
|
Routing PW Grading-Hillside | 4/5/2018 | | 4/6/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
|
Routing - PUBLIC WORKS | 4/6/2018 | | 4/6/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing Walk-In (Zoning) | 4/5/2018 | 4/5/2018 | 4/5/2018 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 4/5/2018 | 4/5/2018 | 4/5/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2
|
Application received | | 4/5/2018 | | | |
|
|
|
|