BLD-Framing/Rough-in | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
PubWorks Subgrade Approval | 7/26/2018 | 7/26/2018 | 7/26/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 7/13/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/13/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/7/2018 | | |
|
|
|
|
Routing - FIRE | 6/7/2018 | 6/7/2018 | 6/7/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (JAB) Josh | 5/3/2018 | 5/3/2018 | 6/7/2018 | | PASS |
Josh Bogle
|
|
|
1st done - pergola in WUI, #310 needed, shade fabric questions
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 6/7/2018 | | DONE |
|
|
|
need GC met
|
Routing - PLAN CHECK | 6/1/2018 | | 6/7/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - FIRE | 6/1/2018 | 6/1/2018 | 6/1/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/10/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/3/2018 | | 5/10/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - FIRE | 5/3/2018 | 5/3/2018 | 5/7/2018 | | FAIL |
Tim Frost
|
|
|
5/09 house addition eplan
|
Routing PW Grading-Hillside | 5/3/2018 | | 5/3/2018 | | PASS |
Melissa Jannusch
|
|
|
Subgrade inspection will be required under pool permit. No subgrade inspection required for landscaping walls.
|
Routing - PLANNING | 5/3/2018 | | 5/3/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | 5/3/2018 | | 5/3/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 5/3/2018 | | 5/3/2018 | | PASS |
Michael Zawacki
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/3/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/3/2018 | | DONE |
|
|
|
no fee taken at intak, 406
|
Intake Approval | | | 5/3/2018 | | PASS |
|
|
|
|
Intake Approval | | | 4/17/2018 | | FAIL |
|
|
|
Project is a CAT I and does not need a P&Z application prior to submittal of building permit. Melissa Jannusch ###-####.
**Prescreen Failed: 1. Need Full structural engineering for steel frame pergola and pergola footings. NOTE: Pool permit will be redlined from plans, separate permit requried for pool.
|
Application received | | | 4/6/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 6 2018 2:09PM
|