Permit Information
Permit NumberBLD18-01226
StatusFinaled
Name VICTORY WINDOW & REMODELING
Site Address 218 S VILLA PL
Project NameVaughn patio
Customer Number 
ePlanReviewNo
Description
MODIFICATION - REPLACING A PREVIOUS PATIO ROOM - SLAB WORK WAS IN PREP FOR THIS - ALL WORK PER PLANS, ENGINEERING, & LOCAL CODE. **jab** Permit to pour a 12'6"x15' concrete patio with a 12" wide footing 24" deep below grade. All work per plans, local codes & ordinances. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/27/20186/28/20186/28/2018APASS
DetailsDave Hannah
Kevin Phone #: ###-####
DOC - Permit Finaled6/28/20186/28/20186/28/2018PPASS
DetailsDave Hannah
BLD-Framing/Rough-in6/14/20186/15/20186/15/2018APEND
DetailsDave Hannah
Kevin Phone #: ###-#### ok after elec rough in
CHANGE STATUS TO (ISS)  6/8/2018 DONE
OVERRIDE  6/7/2018  
Telephone call  6/7/2018 DONE
Spoke with Kevin to inform him the permit plan mod is open and what fees are due
Inspection Record Card- Bld  6/7/2018 DONE
Permit Ready to Issue  6/7/2018 DONE
Plan Mod Approved
DO NOT REISSUE
BLD-Footing6/5/20186/6/20186/6/2018APASS
DetailsDave Hannah
Kevin Phone #: ###-####
Routing Walk-In (BLD)6/6/20186/6/20186/6/2018PDONE
DetailsJosh Bogle
Routing - PLAN CHECK6/6/2018 6/6/2018 PASS
DetailsJosh Bogle
Case Summary (BLD)  6/6/2018 DONE
DetailsJosh Bogle
OVERRIDE  6/5/2018  
Routing Walk-In (BLD)6/5/20186/5/20186/5/2018PDONE
DetailsJosh Bogle
Routing Walk-In (BLD)6/5/20186/5/20186/5/2018PDONE
DetailsJosh Bogle
Routing - PLAN CHECK6/5/2018 6/5/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  6/5/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  6/5/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  6/5/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  6/5/2018 DONE
NEED
RP-n/a
Issue PAID IN FULL permit  6/5/2018 DONE
Routing Walk-In (Zoning)5/7/20185/7/20185/7/2018APASS
DetailsColleen T Carroll
Routing Walk-In (BLD)5/7/20185/7/20185/7/2018AFAIL
DetailsJosh Bogle
Routing - PLAN CHECK5/7/2018 5/7/2018 FAIL
DetailsJosh Bogle
sunroom is a hybrid build; part frame, part engineered system - it's unclear if the marriage of the two sytems is code compliant
1st review completed  5/7/2018 FAIL
DetailsJosh Bogle
Routing Walk-In (Zoning)4/23/20184/23/20184/23/2018ADONE
DetailsJason C. Taylor
Routing Walk-In PW FloodPlain4/23/20184/23/20184/23/2018PPASS
DetailsJason C. Taylor
Project does not meet 50% substantial improvement valuation. Ok to permit without floodplain requirments. Jason Taylor ###-####
Routing Walk-In (Zoning)4/9/20184/9/20184/9/2018AFAIL
DetailsTed Vanegas
Project is located in the floodplain. Applicant needs to meet with Jason Taylor prior to approval of building permit.
Application received 4/9/2018