BLD-Final | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Jim Sly
|
|
|
Please give me a call this morning if possible to schedule an approximate time of inspection so i can meet up with you. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen
|
DOC - Permit Finaled | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | DONE |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Jim Sly
|
|
|
Inspection of Insulation install. Phone #: ###-#### Inspection requested via web by Ryan Allen
|
BLD-Framing/Rough-in | 7/17/2018 | 7/18/2018 | 7/19/2018 | P | PASS |
Jim Sly
|
|
|
HVAC inspection will be about 1. Hoping to have this inspection soon thereafter. Please call prior to heading our way. Thank you very much. Phone #: ###-#### Inspection requested via web by Ryan Allen
|
Plan Modification Accepted | | | 7/16/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 7/16/2018 | | 7/16/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | PASS |
Jim Sly
|
|
|
Inspection of sheer walls on new garage additions prior to house wrapping Phone #: ###-#### Inspection requested via web by Ryan Allen
|
BLD-Conference | 6/11/2018 | 6/11/2018 | 6/11/2018 | A | DONE |
Mike Jordan
|
|
|
Would like to discuss basement framing and fire barrier between floors. Please give me a call 15 minutes or so ahead of visit as I will be off site but will shoot right over. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. Went over floor ceiling issues with contractor.
|
BLD-Foundation | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Jim Sly
|
|
|
AAron-wants to have about 11am because he has concrete at noon Phone #: ###-####
|
BLD-Foundation | 5/18/2018 | 5/21/2018 | 5/21/2018 | A | PART |
Jim Sly
|
|
|
Aaron Phone #: ###-#### Footing for garage addition and garage extension..........stairway to basement......OK.
|
OVERRIDE | | | 5/2/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 4/9/2018 | 4/9/2018 | 5/2/2018 | | PASS |
Josh Bogle
|
|
|
1st done - duplex conversion - see e-mail 4/13/18 JAB
|
Routing - PLAN CHECK | 5/2/2018 | | 5/2/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/2/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/2/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/2/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 4/27/2018 | | 4/27/2018 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 4/17/2018 | | 4/17/2018 | | FAIL |
Troy James
|
|
|
Talked to manual j report designer to provide design for the basement.
|
Routing - MECHANICAL | | | 4/17/2018 | | FAIL |
Chad Schwendiman
|
|
|
No manual J submitted. Called applicant on 4-13-18 and left a message to call me and let me know what the intention is for HVAC. Haven't heard back.
|
Routing Walk-In (BLD) | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | FAIL |
Josh Bogle
|
|
|
looked at re-submittals - waiting on Mech before final review - JAB
|
Plan resubmittals received | | | 4/16/2018 | | DONE |
|
|
|
two copies each of A3.0 Main floor plan, A3.2 Basement plan and A6.1 Proposed floor framing plan. One copy each of engineering and ICC-ES Evaluation Report stamped and taken to JAB
|
1st review completed | | | 4/13/2018 | | DONE |
Josh Bogle
|
|
|
see e-mail 4/13/18 JAB
|
Routing - PLAN CHECK | | | 4/13/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 4/9/2018 | | 4/12/2018 | | PASS |
Celine Acord
|
|
|
per CAA18-00031
|
Plans ACCEPTED BY PLAN TECH | | | 4/9/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/9/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/9/2018 | | DONE |
|
|
|
|
Routing - Addressing | 4/9/2018 | | 4/9/2018 | | PASS |
Doug Chausow
|
|
|
2106 S Orchard St (no change)
2130 S Orchard St (ADU)
|
Routing - PUBLIC WORKS | 4/9/2018 | | 4/9/2018 | | PASS |
Morgan Webb
|
|
|
|
Application received | | 4/9/2018 | | | |
|
|
|
|