Permit Information
Permit NumberBLD18-01234
StatusFinaled
Name ARTISAN CUSTOM CARPENTRY AND RENOVA
Site Address 2106 S ORCHARD ST
Project NameAllen duplex
Customer NumberCAA18-00031
ePlanReviewNo
Description
(2106 & 2130 S. Orchard St.) Permit to add a garage, expand an existing garage, and convert a single family home into a duplex, exterior entrances, one unit at main level (2bd/1bth), one unit in the basement (1bd/1bth). All work per plans, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/3/201810/3/201810/3/2018PPASS
DetailsJim Sly
Please give me a call this morning if possible to schedule an approximate time of inspection so i can meet up with you.
Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen
DOC - Permit Finaled10/3/201810/3/201810/3/2018PPASS
DetailsJim Sly
BLD-Conference7/24/20187/24/20187/24/2018PDONE
DetailsJim Sly
BLD-Energy code compliance7/23/20187/23/20187/23/2018PPASS
DetailsJim Sly
Inspection of Insulation install. Phone #: ###-#### Inspection requested via web by Ryan Allen
BLD-Framing/Rough-in7/17/20187/18/20187/19/2018PPASS
DetailsJim Sly
HVAC inspection will be about 1. Hoping to have this inspection soon thereafter. Please call prior to heading our way. Thank you very much. Phone #: ###-#### Inspection requested via web by Ryan Allen
Plan Modification Accepted  7/16/2018 DONE
new manual j report
Routing - MECHANICAL7/16/2018 7/16/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing6/26/20186/27/20186/27/2018APASS
DetailsJim Sly
Inspection of sheer walls on new garage additions prior to house wrapping Phone #: ###-#### Inspection requested via web by Ryan Allen
BLD-Conference6/11/20186/11/20186/11/2018ADONE
DetailsMike Jordan
Would like to discuss basement framing and fire barrier between floors. Please give me a call 15 minutes or so ahead of visit as I will be off site but will shoot right over. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. Went over floor ceiling issues with contractor.
BLD-Foundation5/24/20185/25/20185/25/2018APASS
DetailsJim Sly
AAron-wants to have about 11am because he has concrete at noon Phone #: ###-####
BLD-Foundation5/18/20185/21/20185/21/2018APART
DetailsJim Sly
Aaron Phone #: ###-####
Footing for garage addition and garage extension..........stairway to basement......OK.
OVERRIDE  5/2/2018  
Routing Walk-In (BLD)5/2/20185/2/20185/2/2018PDONE
DetailsJosh Bogle
Plan assigned to (JAB) Josh4/9/20184/9/20185/2/2018 PASS
DetailsJosh Bogle
1st done - duplex conversion - see e-mail 4/13/18 JAB
Routing - PLAN CHECK5/2/2018 5/2/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  5/2/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  5/2/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  5/2/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  5/2/2018 DONE
Issue PAID IN FULL permit  5/2/2018 DONE
Routing - MECHANICAL4/27/2018 4/27/2018 PASS
DetailsTroy James
Routing - MECHANICAL4/17/2018 4/17/2018 FAIL
DetailsTroy James
Talked to manual j report designer to provide design for the basement.
Routing - MECHANICAL  4/17/2018 FAIL
DetailsChad Schwendiman
No manual J submitted. Called applicant on 4-13-18 and left a message to call me and let me know what the intention is for HVAC. Haven't heard back.
Routing Walk-In (BLD)4/16/20184/16/20184/16/2018PFAIL
DetailsJosh Bogle
looked at re-submittals - waiting on Mech before final review - JAB
Plan resubmittals received  4/16/2018 DONE
two copies each of A3.0 Main floor plan, A3.2 Basement plan and A6.1 Proposed floor framing plan. One copy each of engineering and ICC-ES Evaluation Report stamped and taken to JAB
1st review completed  4/13/2018 DONE
DetailsJosh Bogle
see e-mail 4/13/18 JAB
Routing - PLAN CHECK  4/13/2018 FAIL
DetailsJosh Bogle
Routing - PLANNING4/9/2018 4/12/2018 PASS
DetailsCeline Acord
per CAA18-00031
Plans ACCEPTED BY PLAN TECH  4/9/2018 DONE
Intake Approval  4/9/2018 PASS
Recd Pcfee & Taken To Pln CK  4/9/2018 DONE
Routing - Addressing4/9/2018 4/9/2018 PASS
DetailsDoug Chausow
2106 S Orchard St (no change)
2130 S Orchard St (ADU)
Routing - PUBLIC WORKS4/9/2018 4/9/2018 PASS
DetailsMorgan Webb
Application received 4/9/2018