Permit Information
Permit NumberBLD18-01246
StatusFinaled
Name OKLAND CONSTRUCTION CO INC
Site Address 1290 W MYRTLE ST
Project NamePioneer Crossing Office Buildi
Customer Number 
ePlanReviewYes
Description
(PIONEER CROSSING OFFICE BUILDING) ""PLAN MODIFICATION TO CHANGE THE EXTERIOR FINISH OF THE SOUTH STAIR TOWER"" Permit for the buildout of the core and shell with work to include, restrooms, elevators, entry lobby, electrical, mechanical and fire sprinkler systems per the approved plans. This is a fully sprinklered and alarmed building for area and height increase. The building is type IIB over a type 1A podium per the special provisions of section 510.2/2015 IBC. This permit does not include utilities, foundation or superstructure. This building is fully fire sprinklered for height and area increase Please reference permit BLD18-01166. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/4/20201/27/2020 DONE
This permit finaled on the web by Dave Wall
Third Notice 12/1/201912/30/2019 DONE
mailed 1-1-20
Third Notice 11/3/201911/26/2019 DONE
mailed 12-2-19
Second Notice 9/29/201910/29/2019 DONE
mailed 11-1
First Notice 8/18/20199/19/2019 DONE
mailed 9-20-19
FIRE-Final Inspection8/7/20198/8/20198/8/2019PPASS
DetailsJim Page
Remaining item for radio coverage complete, final life fire safety inspection complete.

Phone #: ###-#### Inspection requested via web by Sam Reading
Permanent Occupancy  8/8/2019 DONE
Temporary Occupancy6/11/20199/9/20196/11/2019 DONE
DetailsTiffany Carson-Herker
PubWorks Occupancy Approval6/10/20196/10/20196/10/2019 DONE
DetailsTiffany Lowery
BLD-Final6/4/20196/7/20196/7/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Sam Reading
Zoning Approval6/7/20196/7/20196/7/2019 DONE
DetailsAndrea Tuning
FIRE-Final Inspection6/4/20196/6/20196/6/2019PPART
DetailsJim Page
Final life fire safety inspection for core and shell substantially complete. Radio test for fire department radio coverage did not pass. A TCO is authorized per conversation with Ron Johnson with Boise Fire contingent on radio coverage issue being resloved, all other items for life fire safety have been inspected and passed.

Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Ceiling Grid Inspection5/10/20195/13/20195/13/2019PPASS
DetailsDave Hannah
Level 3 Ceiling Grid. Phone #: ###-#### Inspection requested via web by Sam Reading 4th fl also ok
BLD-Conference5/6/20195/8/20195/8/2019ADONE
DetailsDave Hannah
Conference to discuss Beneficial Occupancy for the Core and Shell. Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Ceiling Grid Inspection4/30/20195/1/20195/1/2019PPASS
DetailsDave Hannah
Level 2 Grid. Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Ceiling Grid Inspection4/23/20194/24/20194/24/2019APART
DetailsDave Hannah
L1 Ceiling grid Phone #: ###-#### Inspection requested via web by Sam Reading needs elec r/i and also needs mec to strape defusers
OVERRIDE  4/12/2019  
CHANGE STATUS TO (ISS)  4/12/2019 DONE
Telephone call  4/12/2019 DONE
called contractor to ask for 306 for second plan mod
ryan.johnson@okland.com
Permit Ready to Issue  4/12/2019 DONE
PLAN MOD - DO NOT REISSUE
Plan assigned to (CDM)4/2/20194/2/20194/11/2019 PASS
DetailsCarl D Madsen
Routing - Design Review4/10/2019 4/10/2019 PASS
DetailsAndrea Tuning
Routing - PLAN CHECK4/10/2019 4/10/2019 PASS
DetailsCarl D Madsen
Plan Modification Accepted  4/2/2019 DONE
plan mod accepted in e plan-add corridors to level 3 & 4 for future tenants. Add exterior doors & openings-sheets corridors: A132, A133, A142, A631, E203, E204, E303, E304, E605,E610, M002, M241, P431, P 241, M431, P441, UP231, UP241
future TI mods: A112, A113, A122, A201, A512, A162, A631, E201, E301, E306-assigned to Carl M
CHANGE STATUS TO (ISS)  3/15/2019 DONE
Print Occupancy Form  3/15/2019 DONE
OVERRIDE  3/11/2019  
Permit Ready to Issue  3/11/2019 DONE
Plan mod approved
Plan assigned to (CDM)3/1/20193/1/20193/8/2019 PASS
DetailsCarl D Madsen
Routing - Design Review3/6/2019 3/7/2019 PASS
DetailsJosh Wilson
South stair tower material change ok per DRH18-00290.
Routing - PLAN CHECK3/6/2019 3/6/2019 PASS
DetailsCarl D Madsen
BLD-Framing/Rough-in3/1/20193/4/20193/5/2019PPART
DetailsDave Hannah
Sam Phone #: ###-#### core elev and rest rooms ok 5th floor
Plan Modification Accepted  3/1/2019 DONE
add internal stair between levels 4 and 5. the stair is similar construction to the existing stairs. Note the handrails and guardrails will be added in the future tenant improvement that will be submitted at a later date
BLD-Framing/Rough-in2/27/20192/27/20192/27/2019PPASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in2/25/20192/26/20192/26/2019APEND
DetailsJim Sly
Stairwell lids and level 5 shaft and core. Phone #: ###-#### Inspection requested via web by Sam Reading Complete Firestopping at Stairwell Rated Walls, Check HVAC shaft termination at roof deck.......Beams?? Per approved plan? Complete fire stopping of penitrations....Inside.
BLD-Wall cover2/6/20192/7/20192/7/2019APASS
DetailsDave Hannah
North stair tower, Levels 3 and 4 lids Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Wall cover2/4/20192/5/20192/5/2019PCANC
DetailsDave Hannah
North stairwell and level 3 ceilings Phone #: ###-#### >> Inspection requested via web by Sam Reading Inspection cancelled from web by: Sam Reading
BLD-Wall cover1/24/20191/25/20191/25/2019APASS
DetailsDave Hannah
South stair tower insulation. 2nd floor 2 siding drywall. Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Wall cover1/23/20191/24/20191/24/2019PDEFR
DetailsJim Storey
South stair tower insulation. 2nd floor 2 siding drywall. Phone #: ###-#### Inspection requested via web by Sam Reading out of time
BLD-Wall cover1/14/20191/15/20191/16/2019PCANC
DetailsDave Hannah
1st floor insulation for 2 siding drywall. Phone #: ###-#### Inspection requested via web by Sam Reading core areas restrooms elev lobby ok
BLD-Wall cover1/2/20191/2/20191/2/2019PPART
DetailsDave Hannah
Contact Sam Reading. 1st floor interior framing and shaft wall framing at elevators 1-5. Phone #: ###-#### Inspection requested via web by Sam Reading
BLD-Framing/Rough-in11/14/201811/14/201811/15/2018PPART
DetailsDave Hannah
Steve Phone #: ###-####
BLD-Framing/Rough-in11/1/201811/2/201811/2/2018APART
DetailsDave Hannah
Steve Phone #: ###-#### ext sofit and wall 1rst 2nd 3rd floors
BLD-Framing/Rough-in9/21/20189/24/20189/24/2018APART
DetailsDave Hannah
Steve Phone #: ###-#### ext framing okwest half first floor
CHANGE STATUS TO (ISS)  9/21/2018 DONE
PLAN MOD
OVERRIDE  9/5/2018  
Plan assigned to (CDM)8/13/20188/13/20189/5/2018 PASS
DetailsCarl D Madsen
plan mod
Routing - PLAN CHECK8/22/2018 9/5/2018 PASS
DetailsCarl D Madsen
Permit Ready to Issue  9/5/2018 DONE
PLAN MOD
Routing - Design Review8/22/2018 8/22/2018 PASS
DetailsAndrea Tuning
Plan Modification Accepted  8/13/2018 DONE
Plan modification workflow started to change South stair tower finish to full height masonry veneer from masonry veneer and EIFS finish. The Structural portion was previously reviewed and approved in BLD18-01166.
Issue PAID IN FULL permit  6/15/2018 DONE
Print Occupancy Form  6/15/2018 DONE
OVERRIDE  6/8/2018  
Plan assigned to (CDM)4/16/20184/16/20186/8/2018 PASS
DetailsCarl D Madsen
Pioneer Crossing Office Building
Routing - PLAN CHECK6/4/2018 6/8/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  6/8/2018 DONE
DetailsCarl D Madsen
as per Carl M-plan review complete
Permit Ready to Issue  6/8/2018 DONE
NEED
RP
GC -met
Rev Cert of Val -met
Routing PW Geothermal6/4/2018 6/8/2018 PASS
DetailsJon R. Gunnerson
Contact Public Works if a connection to the geothermal heating system is desired.
Routing PW Solid Waste6/4/2018 6/4/2018 PASS
DetailsEvan Carpenter
Routing PW Sewer Design6/4/2018 6/4/2018 PASS
DetailsDeAnn Brown
Routing PW Street Lights6/4/2018 6/4/2018 PASS
DetailsTom Marshall
Routing PW Drainage6/4/2018 6/4/2018 PASS
DetailsBrian Murphy
Routing - Design Review6/4/2018 6/4/2018 PASS
DetailsAndrea Tuning
Routing - PUBLIC WORKS6/4/2018 6/4/2018 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment6/4/2018 6/4/2018 PASS
DetailsMichael Zawacki
Please reference ESC18-00529
Route to Impact Fee Review5/29/20186/1/20185/30/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  5/29/2018 FAIL
Routing - PLAN CHECK4/16/2018 5/29/2018 FAIL
DetailsCarl D Madsen
Routing - FIRE4/16/20184/16/20185/24/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - MECHANICAL4/16/2018 4/26/2018 PASS
DetailsTroy James
Routing - Erosion and Sediment4/16/2018 4/18/2018 FAIL
DetailsMichael Zawacki
No SWPPP or ESC included.
Building permit referenced on checklist (BLD18-01166) was never submitted for ESC review. Note on BLD18-01166 was to include mentioned SWPPP, failed on 4-6-18 by initials BJM. BLD18-01166 did not include a SWPPP to reference back to.
Routing - Addressing4/16/2018 4/17/2018 PASS
DetailsDoug Chausow
Routing - Design Review4/16/2018 4/17/2018 FAIL
DetailsAndrea Tuning
Provide a rooftop screening detail to be reviewed and approved. The mechanical screen should be fullyfinished and include trim and full height screening.

a. Provide a minimum of 12 bicycle parking spaces on the site. A minimum of 3 of the 12 bicycle parking spaces shall be covered. The bicycle parking spaces shall be located within 50-feet of the main entrance to the building. The spaces shall also be a minimum of 6-feet long and 2.5-feet wide and have an overhead clearance of 7-feet if covered. A 4-foot wide aisle is required between rows of bicycle parking spaces or nearby walls. Stationary racks shall be located on improved non-permeable surfaces and anchored to the ground.
Routing - PLANNING4/16/2018 4/17/2018 PASS
DetailsDavid Moser
Routing - PLUMBING4/16/2018 4/17/2018 PASS
DetailsDaryl Spivey
See redlines and install per ISPC.
Routing - PUBLIC WORKS4/16/2018 4/17/2018 FAIL
DetailsRachael Beierle
Must review BLD18-01166 for utilities, groundwork, and drainage prior to shell and core.
Recd Pcfee & Taken To Pln CK  4/16/2018 DONE
Intake Approval  4/16/2018 PASS
Application received  4/10/2018 DONE
Application submitted via PDS Online on Apr 10 2018 11:29AM
BLD-Conference3/21/20193/21/2019 P 
DetailsDave Hannah
Discussion on additional corridors affecting Certificate of Occupancy date. Phone #: ###-#### >> Inspection requested via web by Sam Reading