BLD-Final | 10/26/2018 | 10/29/2018 | 10/29/2018 | A | PASS |
Mike Jordan
|
|
|
Call for access // David Phone #: ###-####
|
DOC - Permit Finaled | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PART |
Tony Young
|
|
|
Call for access // David Phone #: ###-####,, ok,, just needs address facing Garnet st. , seal exterior siding at pipes/ wires,, c of o issued
|
BLD-Energy code compliance | 8/30/2018 | 8/30/2018 | 8/31/2018 | P | PASS |
Tony Young
|
|
|
DAve Phone #: ###-####
|
BLD-Framing/Rough-in | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Tony Young
|
|
|
DAve Phone #: ###-####
|
BLD-Framing/Rough-in | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | FAIL |
Mike Jordan
|
|
|
Steve Phone #: ###-####. Provide truss enginering. Fireblock HVAC chase at cieling first floor. Roll block 2nd floor floor joist At mid bearing. Will need a tenting inspection on fire spinklers prior to energy code inspection. Ok to insulate. Correction notice posted.
|
BLD-Framing/Rough-in | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | NR |
Tony Young
|
|
|
David Phone #: ###-####,, needs fire sprinklers passed 1st
|
OVERRIDE | | | 8/15/2018 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/15/2018 | | DONE |
|
|
|
no fee for plan mod. Plan mod not approved, comply with originally approved plans.
|
Telephone call | | | 8/15/2018 | | DONE |
|
|
|
called and left vm for both Doug Perry ###-#### & Steve Edwards ###-#### that plan mod not approved. Need to comply with originally approved plans, fire sprinkers still required.
|
Permit Ready to Issue | | | 8/15/2018 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 8/2/2018 | 8/2/2018 | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
Paper: plan mod - new site plan for fire department access...Tim has it. CANCELLED; DOES NOT MEET FIRE REQUIREMENTS. MUST STAY AS ORIGINALLY DESIGNED BEING FULLY SPRINKLED.
|
Routing - PLAN CHECK | 8/8/2018 | | 8/14/2018 | | FAIL |
Rob Patrick
|
|
|
Did not do review/ DOES NOT PASS FIRE REQUIREMENTS. MUST STAY AS ORIGINALLY DESIGNED BEING FULLY SPRINKLED.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2018 | | DONE |
|
|
|
|
Routing - FIRE | | | 8/8/2018 | | PASS |
Tim Frost
|
|
|
Plan Mod New SFH
House to be sprinklered due to distance to hydrant.
|
Routing - PLANNING | 8/2/2018 | | 8/3/2018 | | PASS |
Jeff Lowe
|
|
|
|
Plan Modification Accepted | | | 8/2/2018 | | CANC |
Rob Patrick
|
|
|
received two full sized and two reduced size site plans. Plan mod to determine if fire sprinklers not required. CANCELLED, DOES NOT MEET FIRE REQUIREMENTS. MUST STAY AS ORIGINAL DESIGN BEING FULLY SPRINKLED.
|
Plan Modification Accepted | | | 8/1/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 8/1/2018 | | 8/1/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####,, ok after fixes
|
BLD-Foundation | 6/12/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
|
BLD-Footing | 6/11/2018 | 6/12/2018 | 6/12/2018 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
|
BLD-Footing | 6/4/2018 | 6/5/2018 | 6/5/2018 | P | NR |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
|
OVERRIDE | | | 5/31/2018 | | |
|
|
|
|
Routing - FIRE | 5/31/2018 | 5/31/2018 | 5/31/2018 | | PASS |
Tim Frost
|
|
|
They are providing a fire sprinkler system per attached email response.
|
Plan assigned to (RDP) | 4/10/2018 | 4/10/2018 | 5/31/2018 | | DONE |
Rob Patrick
|
|
|
4/23 sfd L1 Paper...4/23 Failed: Needs fully sprinkled.
|
Routing - PLAN CHECK | 5/31/2018 | | 5/31/2018 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 5/31/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/31/2018 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 5/31/2018 | | DONE |
Christina Prado
|
|
|
|
Override - Parcel Holds | | | 5/31/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 5/31/2018 | | DONE |
Christina Prado
|
|
|
Need
RP
|
Telephone call | | | 5/31/2018 | | DONE |
|
|
|
Spoke with Andrew informing him that this permit is ready, the fee amount due and that an RP is needed. Gave a name for RP, but expired. stated what can be done for that part
|
Meeting | | | 5/31/2018 | | DONE |
|
|
|
there was a note in the comments area but had to remove to issue permit and this is what it said: Fire Sprinklers are required in NSF homes per Planning. Route all new Single Family applications to Fire Review - See Nicotte or Todd with questions // C_P
|
Issue PAID IN FULL permit | | | 5/31/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/12/2018 | | 4/23/2018 | | FAIL |
Rob Patrick
|
|
|
4/23...Failed: Needs Fully Sprinkled.
|
Routing - FIRE | | | 4/23/2018 | | FAIL |
|
|
|
4/20 house paper plan
|
1st review completed | | | 4/23/2018 | | FAIL |
Rob Patrick
|
|
|
4/23...Failed: Needs Fully Sprinkled.
|
Routing - MECHANICAL | 4/11/2018 | | 4/12/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 4/10/2018 | 4/13/2018 | 4/11/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 4/10/2018 | | 4/11/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 4/10/2018 | | 4/10/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 4/10/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/10/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/10/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/10/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/10/2018 | | PASS |
|
|
|
|
Application received | | 4/10/2018 | | | |
|
|
|
|