Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD18-01255
StatusFinaled
Name EAGLE EYE CONTRUCTION
Site Address 1109 N MANVILLE ST
Project NameSanders flip
Customer Number 
ePlanReviewNo
Description
Permit for a remodel that includes all new windows, siding and roof, adding an egress window and well in the basement, repairing drywall in the Living Room & Basement, and a full remodel of both Bathrooms and the Kitchen. All work per plans, notes, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/17/20203/18/20203/18/2020APASS
DetailsTell Riley
call for code access- Brock Phone #: ###-####//engineering provided and joist has been fixed//
DOC - Permit Finaled3/18/20203/18/20203/18/2020PPASS
DetailsTell Riley
BLD-Final11/21/201911/22/201911/22/2019AFAIL
DetailsTell Riley
Call for access // Brock Phone #: ###-####/correction notice left on kitchen counter//still need to have cut joist in basement bathroom repaired//
BLD-Final10/28/201910/30/201910/30/2019PFAIL
DetailsTell Riley
call 30 minute ahead - Brock Phone #: ###-####/need mechanical for dryer vent and exhaust fan in basement//provide fix for cut joist in basement bathroom//seal all penetrations at garage separation wall//
BLD-Conference10/17/201810/18/201810/18/2018PDONE
DetailsJim Sly
Darcelle-please call with an approx meet time Phone #: ###-####
Framing OK to cover......
BLD-Conference9/27/20189/27/20189/27/2018PCANC
DetailsJim Sly
BLD-Conference4/18/20184/19/20184/19/2018ADONE
DetailsJim Sly
Please call ahead for access - Brock Phone #: ###-####
Met with Brock....Need house garage separation. Handrail, Smoke Det. CO2 All trade Permits and finals.
Override - Parcel Holds4/18/20181/1/19004/18/2018  
conference only
Routing Walk-In (BLD)4/10/20184/10/20184/10/2018PDONE
DetailsJosh Bogle
Routing - PLAN CHECK4/10/2018 4/10/2018 PASS
DetailsJosh Bogle
1st review completed  4/10/2018 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  4/10/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  4/10/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  4/10/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  4/10/2018 DONE
Override - Parcel Holds  4/10/2018  
Issue PAID IN FULL permit  4/10/2018 DONE
Application received 4/10/2018