BLD-Final | 6/4/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Mike Jordan
|
|
|
Tim Phone #: ###-####
|
DOC - Permit Finaled | 6/5/2018 | 6/5/2018 | 6/5/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 6/1/2018 | 6/4/2018 | 6/4/2018 | P | NR |
Mike Jordan
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 4/24/2018 | 4/25/2018 | 4/25/2018 | P | PASS |
Mike Jordan
|
|
|
we are scheduled for an a.m. plumbing inspection and fire stop will be installed before early afternoon. Phone #: ###-#### Inspection requested via web by Tim Lenberg. All issues resolved. ok to sheet rock.
|
BLD-Framing/Rough-in | 4/23/2018 | 4/24/2018 | 4/24/2018 | P | PART |
Mike Jordan
|
|
|
Please inspect late afternoon as the electrical inspection will not be complete until early afternoon, i was informed by the plumber that a permit was not required. Thanks. Tim Phone #: ###-#### Inspection requested via web by Tim Lenberg. Needs plumbing permit. fire block concealed space, foam seal all penetrations in top and bottom plates.
|
Routing Walk-In (BLD) | 4/10/2018 | 4/10/2018 | 4/10/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/10/2018 | | 4/10/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 4/10/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/10/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/10/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/10/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/10/2018 | | DONE |
|
|
|
|
Application received | | 4/10/2018 | | | |
|
|
|
|