BLD-Final | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PASS |
Jim Sly
|
|
|
Joel Phone #: ###-####
|
DOC - Permit Finaled | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | FAIL |
Brandon Shaw
|
|
|
Need trades finaled, no walk thru at this time...
|
BLD-Final | 10/5/2018 | 10/8/2018 | 10/8/2018 | A | CANC |
Brandon Shaw
|
|
|
Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Jim Sly
|
|
|
Joel Phone #: ###-####
|
BLD-Wall Bracing | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Jim Sly
|
|
|
Joel Phone #: ###-####
|
BLD-Conference | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | DONE |
Jim Sly
|
|
|
Joel Stark Phone #: ###-####
|
BLD-Foundation | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Jim Sly
|
|
|
Joel-pour time 1:00 Phone #: ###-####
|
BLD-Footing | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Joel Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/23/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 4/17/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 4/16/2018 | 4/16/2018 | 4/17/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/17/2018 | | 4/17/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 4/17/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 4/17/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 4/17/2018 | | DONE |
|
|
|
NEED
RP
|
Routing Walk-In (BLD) | 4/12/2018 | | 4/17/2018 | P | DONE |
Brian McGowan
|
|
|
|
Telephone call | | | 4/17/2018 | | DONE |
|
|
|
Left a message for Joel informing him this permit is ready, fee amount due for issuance and that an RP is needed
|
Routing Walk-In (Zoning) | 4/12/2018 | 4/12/2018 | 4/12/2018 | P | PASS |
Sue Cummings
|
|
|
|
1st review completed | | | 4/12/2018 | | FAIL |
Brian McGowan
|
|
|
Need pool info
|
Routing - PLAN CHECK | 4/12/2018 | | 4/12/2018 | | FAIL |
Brian McGowan
|
|
|
Took in plans, will do review while waiting for pool information.
|
Application received | | 4/12/2018 | | | |
|
|
|
|