BLD-Final | 10/5/2018 | 10/8/2018 | 10/8/2018 | A | PASS |
Brandon Shaw
|
|
|
Brad Phone #: ###-####
|
DOC - Permit Finaled | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | FAIL |
Brandon Shaw
|
|
|
Need ELE final
|
BLD-Final | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | NR |
Jim Sly
|
|
|
Brad Phone #: ###-#### Need Mech Final.
|
PubWorks Occupancy Approval | 9/28/2018 | 9/28/2018 | 9/28/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy FOR THE ADU may be approved by the building department. Melissa Jannusch ###-####. POOL OUNDER PERMIT BLD18-01675
|
BLD-Energy code compliance | 7/5/2018 | 7/6/2018 | 7/6/2018 | A | PASS |
Jim Storey
|
|
|
As early as possible Phone #: 2088598694 >> Inspection requested via mobile web by Brad
|
BLD-Framing/Rough-in | 7/2/2018 | 7/2/2018 | 7/2/2018 | P | PASS |
Tony Young
|
|
|
As early as possible Phone #: 2088598694 >> Inspection requested via mobile web by Brad
|
BLD-Framing/Rough-in | 6/29/2018 | 7/2/2018 | 7/2/2018 | A | NR |
Tony Young
|
|
|
As early as possible Phone #: 2088598694 >> Inspection requested via mobile web by Brad,, needs trades
|
BLD-Wall Bracing | 5/30/2018 | 5/31/2018 | 5/31/2018 | A | PASS |
Tony Young
|
|
|
As early as possible Phone #: 2088598694 >> Inspection requested via mobile web by Brad,, see painted ares,, fix,, complete top areas, then ok
|
BLD-Foundation | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PASS |
Tony Young
|
|
|
As early as possible Phone #: 2088598694 >> Inspection requested via mobile web by Brad
|
BLD-Footing | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | PASS |
Jim Sly
|
|
|
As late as possible Phone #: 2088598694 >> Inspection requested via mobile web by Brad
|
BLD-Footing | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | NR |
Tony Young
|
|
|
As late as possible Phone #: 2088598694 >> Inspection requested via mobile web by Brad,, needs soils report,, no inspection made
|
PubWorks Subgrade Approval | 5/3/2018 | 5/3/2018 | 5/3/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 5/2/2018 | | |
|
|
|
|
Telephone call | | | 5/2/2018 | | DONE |
|
|
|
called Merlin to let know permit is ready-he will let homeowner know
|
Issue PAID IN FULL permit | | | 5/2/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/2/2018 | | DONE |
|
|
|
met
|
Plan assigned to (JAB) Josh | 4/13/2018 | 4/13/2018 | 5/1/2018 | | PASS |
Josh Bogle
|
|
|
due 5/2 - Hillside ADU - paper
|
Routing - PLAN CHECK | | | 5/1/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 5/1/2018 | | 5/1/2018 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 5/1/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/1/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2018 | | DONE |
Josh Bogle
|
|
|
|
Route to Impact Fee Review | 4/18/2018 | 4/21/2018 | 4/30/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Route to Impact Fee Review | 4/13/2018 | 4/18/2018 | 4/30/2018 | | PASS |
Eric Bilimoria
|
|
|
|
Route to Impact Fee Review | 4/13/2018 | 4/16/2018 | 4/30/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | | | 4/27/2018 | | PASS |
Tim Frost
|
|
|
5/02 ADU house
There are apparently two permits on this project. One permit showed the building in the defensible space but then was revised on the second permit to be moved outside of the WUI defiensible space. Therefore the second permit passed.
|
Routing - Erosion and Sediment | | | 4/26/2018 | | PASS |
Michael Zawacki
|
|
|
Foothill, site prep inspection required.
|
Routing PW Grading-Hillside | 4/13/2018 | | 4/25/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLANNING | 4/25/2018 | | 4/25/2018 | | PASS |
Nicolette Womack
|
|
|
CAA18-00020 David M.
CFH18-00024 Nicolette
|
Routing - PUBLIC WORKS | | | 4/25/2018 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 4/18/2018 | | DONE |
Josh Bogle
|
|
|
changed permit to a 404 to better reflect the nature of the project and the necessary review time-frames
|
Plans ACCEPTED BY PLAN TECH | | | 4/13/2018 | | DONE |
|
|
|
ok to take in during appeal period of CFH per Nicolette W.
|
Intake Approval | | | 4/13/2018 | | PASS |
|
|
|
|
Routing - Addressing | 4/13/2018 | | 4/13/2018 | | PASS |
Laura Hunter
|
|
|
ADU address is 1624 N Ridgecliff Ln. Added addressing fee to permit
|
Application received | | 4/13/2018 | | | |
|
|
|
|