Permit Information
Permit NumberBLD18-01293
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 12639 W EXPLORER DR Unit: 200
Project NameBetter Business Bureau
Customer Number 
ePlanReviewYes
Description
(BETTER BUSINESS BUREAU – EXPLORER POINTE BLDG - SUITE #200) Permit is to remodel an existing 10,141 sq. ft. business space on the 2nd floor within the existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls to create open office areas, removal of select door/door frame, creating a new accessible toilet within the existing shower rooms, select new plumbing fixtures, adding a vertical grab bar in the existing accessible restrooms, electrical work, plumbing work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 7/19/20187/13/2018 DONE
This permit finaled on the web by Brian McCoy
Permanent Occupancy  7/9/2018 DONE
BLD-Final7/5/20187/5/20187/5/2018PPASS
DetailsJim Sly
Tom Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection6/28/20186/29/20186/29/2018APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.

Tom Phone #: ###-####
BLD-Framing/Rough-in6/8/20186/8/20186/8/2018PPASS
DetailsJim Sly
Tom-would like as early as possible if possible Phone #: ###-####
Telephone call  4/25/2018 DONE
emailed fees due to Brian
Issue PAID IN FULL permit  4/25/2018 DONE
Print Occupancy Form  4/25/2018 DONE
Plan assigned to (JG)4/16/20184/16/20184/24/2018 PASS
DetailsJavier Guzman
4/20 L1 Better Business Bureau ePlan pend plumb
1st review completed  4/24/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  4/24/2018 DONE
Permit Ready to Issue  4/24/2018 DONE
Need
GC Form
Revised Cert of Value
Routing - PLAN CHECK4/16/2018 4/23/2018 PASS
DetailsJavier Guzman
Routing - PLUMBING4/23/2018 4/23/2018 PASS
DetailsDaryl Spivey
See redline notes.
Routing - Addressing4/16/2018 4/16/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/16/2018 4/16/2018 PASS
DetailsRachael Beierle
Intake Approval  4/16/2018 PASS
DetailsJavier Guzman
Application received  4/13/2018 DONE
Application submitted via PDS Online on Apr 13 2018 8:41AM