Permit Information
Permit NumberBLD18-01295
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 720 E PARK BLVD Unit: 230
Project NameSt. Lukes WGCP - Suite 230
Customer Number 
ePlanReviewYes
Description
(ST. LUKES WGCP – 2nd FLOOR SUITE #230) The fire sprinkler system is used for unlimited area of the building. Permit is to remodel an existing 2,233 sq. ft. business space on the 2nd floor within the existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of suspended acoustic ceiling, removal of select millwork, construction of select interior nonbearing walls to create (2) interview rooms, a communication room, a copy/work area, a break area, open office area, a conference room and a reception/waiting area, select new door/door frames, new suspended acoustic ceiling, light fixtures, electrical work, plumbing work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/17/201810/31/2018 DONE
This permit finaled on the web by Curtis Weedop
Second Notice 9/20/201810/12/2018 DONE
mailed 10-15-18
First Notice 8/16/20189/10/2018 DONE
mailed 9-11-18
Permanent Occupancy  8/6/2018 DONE
BLD-Final8/2/20188/3/20188/3/2018APASS
DetailsDave Hannah
Zach Phone #: ###-####
FIRE-Final Inspection7/31/20188/1/20188/1/2018APASS
DetailsJim Page
Fianl life fire safety inspection for area of work complete.

Zack Phone #: ###-####
BLD-Ceiling Grid Inspection7/24/20187/25/20187/25/2018APASS
DetailsDave Hannah
Zac Phone #: ###-####
BLD-Framing/Rough-in5/22/20185/22/20185/23/2018PPASS
DetailsDave Hannah
Zach Phone #: ###-####
(F) Reprint permit  4/30/2018 DONE
Telephone call  4/25/2018 DONE
called-talked to Victoria-still have SWR fees due before we can issue the permit-emailed them to her
Issue PAID IN FULL permit  4/25/2018 DONE
Print Occupancy Form  4/25/2018 DONE
Telephone call  4/25/2018 DONE
emailed Doug that we need the building permit signed before we can approve the stamped drawings
Route to Impact Fee Review4/24/20184/27/20184/24/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JG)4/16/20184/16/20184/24/2018 PASS
DetailsJavier Guzman
4/20 L1 WGCP - Robert Half Suite 230 ePlan
Routing - PLAN CHECK4/16/2018 4/24/2018 PASS
DetailsJavier Guzman
1st review completed  4/24/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  4/24/2018 DONE
Permit Ready to Issue  4/24/2018 DONE
DetailsChristina Prado
NEED
GC - met
Rev cert of val - met

Email permits to: Dahlberg, Michael at dahlberm@slhs.org
Routing - MECHANICAL4/16/2018 4/19/2018 PASS
DetailsTroy James
Routing - Addressing4/16/2018 4/16/2018 PASS
DetailsDoug Chausow
Suite 230
Routing - PUBLIC WORKS4/16/2018 4/16/2018 PASS
DetailsRachael Beierle
Routing - PLUMBING4/16/2018 4/16/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC
Intake Approval  4/16/2018 PASS
DetailsJavier Guzman
Application received  4/13/2018 DONE
Application submitted via PDS Online on Apr 13 2018 9:18AM