BLD-Final | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Mike Jordan
|
|
|
Kelly Phone #: ###-####. Ok for perm occ. No card on site to sign.
|
FIRE-Final Inspection | 10/26/2018 | 10/29/2018 | 10/29/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
Rick Phone #: ###-####
|
FIRE-Final Inspection | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | FAIL |
Jim Page
|
|
|
FIR permit for associated fire alarm modifications (FIR18-00483) in area of work needs to be finaled before life fire safety inspection can be completed.
Kelly Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/2/2018 | 8/2/2018 | 8/2/2018 | P | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
BLD-Wall cover | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/2/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/2/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/22/2018 | | DONE |
|
|
|
NEED - all met
GC FORM
REVISED VALUE
|
Plan assigned to (BJM) | 4/23/2018 | 4/23/2018 | 6/21/2018 | | DONE |
Brian McGowan
|
|
|
Failed - need more info- St. Lukes Psychiatric L-2 Due 5/1
|
Routing - PLAN CHECK | 6/21/2018 | | 6/21/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2018 | | DONE |
Brian McGowan
|
|
|
|
Route to Impact Fee Review | 5/15/2018 | 5/18/2018 | 5/16/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 5/14/2018 | | 5/15/2018 | | FAIL |
Brian McGowan
|
|
|
Need more info on the entire tenant space
|
1st review completed | | | 5/15/2018 | | FAIL |
Brian McGowan
|
|
|
Need more info on the entire tenant space
|
Intake Approval | | | 4/19/2018 | | PASS |
|
|
|
|
Application received | | | 4/16/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 16 2018 2:31PM
|