DOC - Permit Finaled | | | 7/18/2018 | | DONE |
|
|
|
Per passing inspection 6/15/18
|
BLD-Final | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | DONE |
Bob Archibald
|
|
|
Demolition and top soil stabilization complete.
|
BLD-Final | 5/31/2018 | 5/31/2018 | 5/31/2018 | P | FAIL |
Bob Archibald
|
|
|
Andrea Phone #: ###-####. Not ready needs final grading work
|
BLD-Conference | 5/21/2018 | 5/21/2018 | 5/21/2018 | A | PEND |
Bob Archibald
|
|
|
Conference with demo contractor on all three sites. Ponding at this location to be pumped out an approved seed mixture to be applied on all sites for top soil stabilization and property at 200 Alto Via to be sloped towards street.
|
BLD-Other | 5/8/2018 | 5/7/2018 | 5/7/2018 | A | PART |
Bob Archibald
|
|
|
Demo in progress
|
Issue PAID IN FULL permit | | | 5/4/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 4/27/2018 | | |
|
|
|
|
Routing PW Grading-Hillside | 4/27/2018 | | 4/27/2018 | | PASS |
Jason C. Taylor
|
|
|
Site stabilization will be required as per the Hillside Ordinance. Public Works approval of stabilization will be required prior to permit final. Jason Taylor ###-####.
|
Routing - Erosion and Sediment | | | 4/27/2018 | | PASS |
Andy J. Long
|
|
|
ESC permit approved. Certified RP designated. See also executed contrart SFB 18-237 (PWE 818): Alto Via Demolition Project #2
Site Final Inspection required.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/27/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
OVERRIDE | | | 4/26/2018 | | |
|
|
|
|
Application received | | 4/17/2018 | | | |
|
|
|
|