First Notice | 10/26/2018 | 10/26/2018 | 11/7/2018 | | DONE |
Mike Jordan
|
|
|
mailed 11-12
|
PubWorks Occupancy Approval | 10/29/2018 | 10/29/2018 | 10/29/2018 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Mike Jordan
|
|
|
Rick martin Phone #: ###-####
|
DOC - Permit Finaled | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Rick Phone #: ###-####
|
Zoning Approval | 10/26/2018 | 10/26/2018 | 10/26/2018 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Energy code compliance | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####. Air seal pak ok.
|
BLD-Framing/Rough-in | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | PART |
Mike Jordan
|
|
|
Rick Phone #: ###-####. Needs to complete airseal and provide draft stop in attic.
|
BLD-Wall Bracing | 8/20/2018 | 8/21/2018 | 8/21/2018 | P | PASS |
Jim Storey
|
|
|
Rick Phone #: ###-####
|
BLD-Other | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Mike Jordan
|
|
|
Rick-foam insulation around the exterior of the pad Phone #: ###-####
|
BLD-Footing | 7/18/2018 | 7/19/2018 | 7/19/2018 | P | PART |
Mike Jordan
|
|
|
Rick Phone #: ###-####. Work in progress. Ok to place concrete pending special inspection.
|
OVERRIDE | | | 7/3/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 5/9/2018 | 5/9/2018 | 7/3/2018 | | DONE |
Brian McGowan
|
|
|
1st review complete - corrections needed - Aspen Dental Shell New Due june 19th
|
Inspection Record Card- Bld | | | 7/3/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/3/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/3/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/3/2018 | | 7/3/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/3/2018 | | DONE |
|
|
|
NEED- all met
GC- met
Rev cert of Val- met
RP
|
Routing Off Site - STRUCTURAL | 7/2/2018 | | 7/2/2018 | | PASS |
Brian McGowan
|
|
|
Approved
|
Plan Reviewer's activity | | | 7/2/2018 | | |
Brian McGowan
|
|
|
Requested updated COMcheck from Architect to reflect perimeter insulation modification on drawings. He will email it to me.
|
Routing PW Drainage | 6/29/2018 | | 6/29/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 6/21/2018 | | 6/21/2018 | | PASS |
DeAnn Brown
|
|
|
Sewer is in existing ingress/egress access easement.
|
Routing - PUBLIC WORKS | 6/20/2018 | | 6/20/2018 | | FAIL |
|
|
|
NEED SHEET C3.0 AND BANK OK?
|
Route to Impact Fee Review | 6/12/2018 | 6/15/2018 | 6/13/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 5/9/2018 | | 6/12/2018 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 6/12/2018 | | FAIL |
Brian McGowan
|
|
|
Corrections required
|
Routing - FIRE | 5/9/2018 | 5/9/2018 | 6/11/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Drainage | 5/9/2018 | | 5/17/2018 | | FAIL |
Brian Murphy
|
|
|
NEED DETAILS SHEET SEPAGE BED PLACEMENT CONFLICTS WITH ARCH. SITE PLAN
|
Routing PW Environmental | 5/9/2018 | | 5/15/2018 | | PASS |
Rick Christenson
|
|
|
When TI occurs, must include approved amalgam separator. See https://publicworks.cityofboise.org/services/sewer/pretreatment-program/approvedamalgamseparators/
|
Routing - MECHANICAL | 5/9/2018 | | 5/14/2018 | | PASS |
Troy James
|
|
|
No HVAC design
|
Routing - PLUMBING | 5/9/2018 | | 5/11/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing PW Street Lights | 5/9/2018 | | 5/11/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLANNING | 5/9/2018 | | 5/10/2018 | | PASS |
Leon Letson
|
|
|
PLA finished.
|
Routing - Design Review | 5/9/2018 | | 5/10/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH18-00057
|
Routing - Erosion and Sediment | 5/9/2018 | | 5/10/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan with narrative and site map approved. RP tbd. Site preparation inspection is required.
|
Routing - Addressing | 5/9/2018 | | 5/9/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/9/2018 | | 5/9/2018 | | PASS |
Rachael Beierle
|
|
|
SHELL ONLY
|
Plans ACCEPTED BY PLAN TECH | | | 5/9/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/9/2018 | | DONE |
|
|
|
|
Intake Approval | | | 5/9/2018 | | PASS |
|
|
|
|
Routing PW Solid Waste | 5/9/2018 | | 5/9/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Sewer Design | 5/9/2018 | | 5/9/2018 | | FAIL |
DeAnn Brown
|
|
|
Where sewer service crosses another parcel, sewer shall be located in the existing cross easement (ROS 11342) or evidence of a new easement or other easement shall be provided. Add note at connection to mainline. See changemarks in eplanreview.
|
Meeting | | | 5/8/2018 | | DONE |
|
|
|
hard copy of appendix j (O&M) taken to Brian Murphy
|
Plan Reviewer's activity | | | 5/7/2018 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 4/24/2018 | | FAIL |
|
|
|
(4-24-18) Please refer to the circled items in the plan intake checklist. Please resolve each item as directed. CJW
|
Application received | | | 4/19/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 19 2018 4:50PM
|
Routing Off Site - STRUCTURAL | 5/9/2018 | | | | FAIL |
Brian McGowan
|
|
|
Corrections required
|