BLD-Final | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Dave Hannah
|
|
|
Dominick Phone #: ###-####
|
DOC - Permit Finaled | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | FAIL |
Dave Hannah
|
|
|
Dominic Phone #: ###-#### needs temp glassing bathroom window adu bathroom smoke and co2 detectors in exst house
|
BLD-Aging Inspection | 2/28/2019 | 2/28/2019 | 3/6/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Brandon Shaw
|
|
|
Interior remodel, OK to cover...
|
BLD-Framing/Rough-in | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | PASS |
Brandon Shaw
|
|
|
Interior remodel portion
|
BLD-Energy code compliance | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Dave Hannah
|
|
|
Dominic Phone #: ###-####
|
BLD-Framing/Rough-in | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Dave Hannah
|
|
|
Dominic Phone #: ###-####
|
BLD-Framing/Rough-in | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PART |
Dave Hannah
|
|
|
Dominic Phone #: ###-#### ext walls ok to inslate
|
BLD-Energy code compliance | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PART |
Dave Hannah
|
|
|
Dominic Phone #: ###-#### air seal ok
|
BLD-Wall Bracing | 7/2/2018 | 7/2/2018 | 7/2/2018 | P | PASS |
Dave Hannah
|
|
|
Dominic Phone #: ###-####
|
BLD-Footing | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Brandon Shaw
|
|
|
JR Phone #: ###-####
|
OVERRIDE | | | 5/2/2018 | | |
|
|
|
|
Route to Impact Fee Review | 4/25/2018 | 4/30/2018 | 5/2/2018 | | PASS |
Eric Bilimoria
|
|
|
|
Telephone call | | | 5/2/2018 | | DONE |
|
|
|
called Drew to let know permit is readuy and how much is owed
|
Issue PAID IN FULL permit | | | 5/2/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/2/2018 | | DONE |
|
|
|
met-NEED
RP-met
|
Plan assigned to (JAB) Josh | 4/20/2018 | 4/20/2018 | 5/1/2018 | | PASS |
Josh Bogle
|
|
|
1st done - addition/ADU - see e-mail 4/25/18
|
Plan resubmittals received | | | 5/1/2018 | | DONE |
|
|
|
Resubmittals received for ADU-recieved 3 sets of sheets A1.0, A2.0, A3.0, A4.0, A5.0, A6.0, A7.0, A8.0, A9.0, A10.0, A11.0, A12.0, A13.0 (2 different details), A15.0-took to JAB
|
Routing - PLAN CHECK | 5/1/2018 | | 5/1/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/1/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/1/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2018 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLANNING | 4/27/2018 | | 4/27/2018 | | PASS |
Brent Moore
|
|
|
|
Routing - PUBLIC WORKS | | | 4/27/2018 | | PASS |
|
|
|
|
Routing - Addressing | 4/25/2018 | | 4/26/2018 | | PASS |
Doug Chausow
|
|
|
ADU address: 1724 E Warm Springs Ave
|
Routing - PLAN CHECK | 4/20/2018 | | 4/25/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 4/25/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 4/20/2018 | 4/20/2018 | 4/20/2018 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 4/20/2018 | 4/20/2018 | 4/20/2018 | A | PASS |
Josh Bogle
|
|
|
took in as a level 2 - lots of engineering to read
|
Permit Ready to Issue | | | 4/20/2018 | | DONE |
|
|
|
|
Application received | | 4/20/2018 | | | |
|
|
|
|