BLD-Final | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | PASS |
Jim Storey
|
|
|
Larry Phone #: ###-####
|
DOC - Permit Finaled | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | PASS |
Jim Storey
|
|
|
Larry Phone #: ###-#### ok for cover
|
Routing - MECHANICAL | 4/27/2018 | | 4/27/2018 | | PASS |
Troy James
|
|
|
Manual j report
|
Routing Walk-In (BLD) | 4/25/2018 | 4/25/2018 | 4/25/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/25/2018 | | 4/25/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/25/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/25/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/25/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/25/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 4/24/2018 | 4/24/2018 | 4/24/2018 | A | FAIL |
Brian McGowan
|
|
|
Catherine Scott had questions about what I was asking for. They were not submitting plans.
|
Routing Walk-In (BLD) | 4/23/2018 | 4/23/2018 | 4/23/2018 | A | FAIL |
Brian McGowan
|
|
|
They removed existing bearing walls and structure. Need information on what they replaced them with. Need beam sizes and structure indicated on plans.
|
Routing - PLAN CHECK | 4/23/2018 | | 4/23/2018 | | FAIL |
Brian McGowan
|
|
|
They removed existing bearing walls and structure. Need information on what they replaced them with. Need beam sizes and structure indicated on plans.
|
Routing Walk-In (BLD) | 4/20/2018 | 4/20/2018 | 4/20/2018 | A | FAIL |
Josh Bogle
|
|
|
need more info
|
Routing - PLAN CHECK | 4/20/2018 | | 4/20/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 4/20/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 4/20/2018 | | | |
|
|
|
|