BLD-Final | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Jim Sly
|
|
|
John Phone #: ###-#### Blower Door....3.59
|
DOC - Permit Finaled | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/18/2019 | 1/22/2019 | 1/22/2019 | P | DEFR |
Dave Hannah
|
|
|
John Phone #: ###-#### no inspection done need hillside they posted bond but pw hasent entered it
|
PubWorks Occupancy Approval | 1/22/2019 | 1/22/2019 | 1/22/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Conference | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | PASS |
Tony Young
|
|
|
Phil Phone #: ###-####// ?s on guard rail,, exterior 30 '' rule 36'' out
|
BLD-Wall cover | 9/25/2018 | 9/26/2018 | 9/26/2018 | P | PASS |
Jim Sly
|
|
|
Phil Phone #: ###-#### Energy Code inspection....OK.
|
BLD-Other | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PART |
Tony Young
|
|
|
sheetrock outside- Phil Phone #: ###-####,, work in progress,, ok
|
BLD-Framing/Rough-in | 9/18/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Tony Young
|
|
|
Phil Phone #: ###-####,, ok to insulate
|
BLD-Framing/Rough-in | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PART |
Tony Young
|
|
|
Phil Phone #: ###-####,, needs seal pack,, conf walk through
|
BLD-Other | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | PART |
Brandon Shaw
|
|
|
Hats in place
|
BLD-Wall Bracing | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PART |
Tony Young
|
|
|
John Phone #: ###-####,, exterior ok
|
BLD-Wall Bracing | 8/20/2018 | 8/21/2018 | 8/21/2018 | P | NR |
Tony Young
|
|
|
John Phone #: ###-####,, need reviewed plans,, floor to floor straps
|
BLD-Footing | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | PART |
Tony Young
|
|
|
pour around 930 // Bill Phone #: ###-####
|
BLD-Foundation | 6/6/2018 | 6/7/2018 | 6/7/2018 | A | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Tony Young
|
|
|
Bill Phone #: ###-####,, early pm
|
BLD-Energy code compliance | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | CANC |
Tony Young
|
|
|
Dan
|
BLD-Footing | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | DEFR |
Tony Young
|
|
|
Bill Phone #: ###-####,, defer to early pm
|
BLD-Footing | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | NR |
Tony Young
|
|
|
Bill Phone #: ###-####
|
PubWorks Subgrade Approval | 5/25/2018 | 5/25/2018 | 5/25/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 5/14/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/7/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 4/20/2018 | 4/20/2018 | 5/7/2018 | | DONE |
Rob Patrick
|
|
|
5/9 sfd L2 Paper
|
Routing - PLAN CHECK | | | 5/7/2018 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 5/7/2018 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 5/7/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2018 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 5/7/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 5/7/2018 | | DONE |
|
|
|
met
|
Telephone call | | | 5/7/2018 | | DONE |
|
|
|
called Johnb to let know permit is ready and how much is owed-left message on his phone
|
Routing - FIRE | 5/1/2018 | 4/20/2018 | 5/2/2018 | | PASS |
Erika Akin
|
|
|
Plans were reviewed for FD access, availability of hydrants and defensible space.
|
Routing PW Grading-Hillside | 4/20/2018 | | 5/1/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PUBLIC WORKS | 5/1/2018 | | 5/1/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 5/1/2018 | | 5/1/2018 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative approved. ESC site preparation inspection is required.
|
Routing - MECHANICAL | | | 5/1/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/1/2018 | | 5/1/2018 | | PASS |
Nicolette Womack
|
|
|
Plans show second kitchen in basement. The home is not approved for a second dwelling unit. If desired apply for ADU.
Eaves shall not encroach more than 2' into setback. Rear covered patio shall be revised to reflect as such.
|
Route to Impact Fee Review | 4/20/2018 | 4/23/2018 | 4/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 4/20/2018 | | 4/20/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/20/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/20/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/20/2018 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 4/20/2018 | | PASS |
Tisha Gallop
|
|
|
Intake Approval per Nicolette
|
Application received | | 4/20/2018 | | | |
|
|
|
|