BLD-Aging Inspection | 12/13/2019 | 12/13/2019 | 12/13/2019 | | PASS |
Jim Storey
|
|
|
signed card
|
FIRE-Final Inspection | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. Previous corrections have been addressed. Willy Phone #: ###-####
|
BLD-Final | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | PASS |
Jim Storey
|
|
|
please call for access, Willie Phone #: ###-####building ok for final pending pw and fire
|
FIRE-Final Inspection | 4/19/2019 | 4/22/2019 | 4/22/2019 | P | PART |
Jim Page
|
|
|
Fire alarm inspection is complete, fire sprinkler permit will remain in issued status until sprinklers are added/inspected for the de-commissioning of old paint booth, all other fire sprinkler related items is substantially complete excluding old paint booth, fire extinguishers are placed with current inspection tags. 60 day TCO authorized for life safety for paint booth/paint booth building per conversation with Ron Johnson. A follow up inspection for life fire safety will be required after fire sprinkler scope of work is complete.
Will Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 2/14/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/14/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 2/7/2019 | 2/7/2019 | 2/13/2019 | | PASS |
Javier Guzman
|
|
|
Plan Mod Peterbilt Paint Booth
|
Routing - PLAN CHECK | 2/12/2019 | | 2/13/2019 | | PASS |
Javier Guzman
|
|
|
|
CHANGE STATUS TO (RDY) | | | 2/13/2019 | | DONE |
|
|
|
plan mod 2
|
Routing - MECHANICAL | 2/12/2019 | | 2/12/2019 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 2/7/2019 | | DONE |
|
|
|
Change gas piping to reflect 5# Supply
|
Print Occupancy Form | | | 1/30/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/30/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/29/2019 | | |
|
|
|
|
Plan assigned to (JG) | 1/8/2019 | 1/8/2019 | 1/29/2019 | | PASS |
Javier Guzman
|
|
|
1st rev comp, Plan Mod Peterbilt Paint Booth, pend fire, mech
|
Routing - PLAN CHECK | 1/28/2019 | | 1/29/2019 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 1/29/2019 | | DONE |
|
|
|
plan mod-do not re issue-Need GC to fill out cert of val for the plan mod-please add if fees changed-called Trevor ###-#### he will get us the cert of val for the plan mod
|
Routing - MECHANICAL | 1/28/2019 | | 1/28/2019 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 1/16/2019 | 1/16/2019 | 1/25/2019 | | PASS |
Erika Akin
|
|
|
No change to previous comments with plan mod
|
Routing - MECHANICAL | 1/16/2019 | | 1/25/2019 | | FAIL |
Troy James
|
|
|
Failed in ePlan by Troy James
|
Routing - PLAN CHECK | 1/16/2019 | | 1/23/2019 | | PASS |
Javier Guzman
|
|
|
|
Plan Modification Accepted | | | 1/8/2019 | | DONE |
|
|
|
delete co2 and nitrogen detection, ventilation and makeup wir system. delete space heaters, provide radiant heating. modify gas piping
|
BLD-Foundation | 9/21/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-####
|
BLD-Foundation | 9/17/2018 | 9/18/2018 | 9/18/2018 | A | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-####ft and permitor insulation
|
BLD-Other | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Jim Storey
|
|
|
reabar // Doug Phone #: ###-####
|
BLD-Foundation | 8/27/2018 | 8/29/2018 | 8/29/2018 | P | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-#### pending mti s/i
|
Print Occupancy Form | | | 7/17/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/17/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/10/2018 | | |
|
|
|
|
Plan assigned to (JG) | 4/26/2018 | 4/26/2018 | 7/10/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 5/25 Peterbuilt ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/10/2018 | | DONE |
|
|
|
ALL MET
NEED Trever Poulsen; trever@ultimatesteelerection.com
RP
MET
GC FORM
REVISED VALUE
|
Routing - PLAN CHECK | 7/3/2018 | | 7/10/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 7/3/2018 | 7/3/2018 | 7/9/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 7/3/2018 | | 7/9/2018 | | PASS |
Javier Guzman
|
|
|
Signed off in ePlan by AHJ Engineers Chris Holladay
|
Routing - MECHANICAL | 7/3/2018 | | 7/5/2018 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 7/3/2018 | | 7/3/2018 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 5/25/2018 | 5/28/2018 | 5/29/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 5/25/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 4/26/2018 | 4/26/2018 | 5/24/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - PLAN CHECK | 4/26/2018 | | 5/23/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 4/26/2018 | | 5/15/2018 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Ena Beganovic
|
Routing - PLANNING | 4/26/2018 | | 5/11/2018 | | PASS |
Brent Moore
|
|
|
ROS17-00072
|
Routing PW Drainage | 4/26/2018 | | 5/4/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Environmental | 4/26/2018 | | 5/4/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 4/26/2018 | | 5/1/2018 | | FAIL |
Troy James
|
|
|
Need gas piping design
|
Routing - PLUMBING | 4/26/2018 | | 4/27/2018 | | PASS |
Bill VanDegrift
|
|
|
no plumbing
|
Routing PW Solid Waste | 4/26/2018 | | 4/27/2018 | | PASS |
Evan Carpenter
|
|
|
|
Intake Approval | | | 4/26/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/26/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/26/2018 | | DONE |
|
|
|
|
Routing - Design Review | 4/26/2018 | | 4/26/2018 | | FAIL |
Andrea Tuning
|
|
|
DRH18-00155
This requires Design Review Approval. And then a 10 day appeal period.
|
Routing PW Street Lights | 4/26/2018 | | 4/26/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - Addressing | 4/26/2018 | | 4/26/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/26/2018 | | 4/26/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 4/26/2018 | | 4/26/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver approved, please refer to ESC17-01372
|
Application received | | | 4/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 20 2018 2:37PM
|