BLD-Final | 2/1/2019 | 2/4/2019 | 2/4/2019 | A | PASS |
Tony Young
|
|
|
Goldie Phone #: ###-####
|
DOC - Permit Finaled | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Wall cover | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Tony Young
|
|
|
Goldy Phone #: ###-####,, insulation ok
|
BLD-Framing/Rough-in | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PASS |
Tony Young
|
|
|
Goldy Phone #: ###-####
|
BLD-Conference | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | DONE |
Mike Jordan
|
|
|
Goldy Phone #: ###-####
|
BLD-Wall Bracing | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Tony Young
|
|
|
Goldie-nailing-would like as early as possible if possible Phone #: ###-####
|
Routing - MECHANICAL | 6/29/2018 | | 6/29/2018 | | PASS |
Troy James
|
|
|
Manual j report submitted and reviewed per the owners request.
|
Meeting | | | 6/28/2018 | | DONE |
|
|
|
Manual S taken to Troy James
|
BLD-Foundation | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PART |
Tony Young
|
|
|
Tim Phone #: ###-####,, work in progress,, ok
|
BLD-Foundation | 6/8/2018 | 6/11/2018 | 6/11/2018 | A | DONE |
Dave Hannah
|
|
|
Tim Phone #: ###-####-trench full of water
|
BLD-Footing | 6/6/2018 | 6/7/2018 | 6/7/2018 | A | PART |
Mike Jordan
|
|
|
plans on patio // Tim Phone #: ###-####. Needs to provide additional vertical reinforcement. Should have two verts at required spacing, not one. Contacted Tim to notify him. Ok to place concrete. Will verify additional verts on stemwall inspection.
|
Issue PAID IN FULL permit | | | 5/24/2018 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 5/22/2018 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 5/22/2018 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2018 | | DONE |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 5/22/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/22/2018 | | DONE |
|
|
|
|
Telephone call | | | 5/22/2018 | | DONE |
|
|
|
called Goldy to let know permit is ready and how much is owed
|
Routing - PLAN CHECK | 4/27/2018 | | 5/22/2018 | | PASS |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 4/27/2018 | | 5/22/2018 | | DONE |
Michael Hanson
|
|
|
05/24 addition L2
|
Routing - PLANNING | 5/21/2018 | | 5/21/2018 | | PASS |
Celine Acord
|
|
|
per CAA18-00068
|
Routing Walk-In (Zoning) | 4/27/2018 | 4/27/2018 | 4/27/2018 | A | FAIL |
Jeff Lowe
|
|
|
4-30-18 after discussion with Planners/Reveiwers, this building permit is to be on hold pending outcome of CAA18-00068. permit is for building only. Home Occ under separate review. Home Occ not approved with this permit.
|
Routing Walk-In (BLD) | 4/27/2018 | 4/27/2018 | 4/27/2018 | A | CANC |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 4/27/2018 | 4/27/2018 | 4/27/2018 | | DEFR |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 4/23/2018 | 4/23/2018 | 4/23/2018 | A | FAIL |
|
|
|
Needs Home Occupation Approval
|
1st review completed | | | 4/23/2018 | | FAIL |
Josh Bogle
|
|
|
need zoning approval
|
Application received | | 4/23/2018 | | | |
|
|
|
|