Permit Information
Permit NumberBLD18-01423
StatusFinaled
Name MJT CONSTRUCTION INC
Site Address 909 E PARKCENTER BLVD
Project NameAlbertsons
Customer Number 
ePlanReviewYes
Description
(ALBERTSONS - INTERIOR REMODEL) //Plan Modification #2 to revise the location of floor sinks in the Starbucks kiosk and plumbing work. 8-3-2018 JG// - //Plan modification #1 to add online order pick-up area at north/east entry vestibule and add an exterior 4’ CMU wall with storefront system above under existing canopy. 6-6-2018 JG// Permit to remodel an existing 50,724 sq. ft. retail grocery store. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select cooler doors and replace with new cooler doors, removal of select interior nonbearing walls, removal of select door/door frame, removal of select millwork, construction of interior non-bearing walls to create a smaller cash room and a Starbucks storage area, a new Starbucks kiosk and associated equipment, select new door/door frame, relocated and or new display cases and refrigerated cases, (6) new checkstands, select new millwork, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  2/8/2019 DONE
Second Notice 12/24/20181/8/2019 DONE
mailed 1-11-19
First Notice11/14/201811/14/201812/14/2018 DONE
DetailsBrandon Shaw
mailed 12-17
BLD-Final11/13/201811/14/201811/14/2018APASS
DetailsBrandon Shaw
Please call ahead ###-#### the plans for this project are located in the drive up and go space left hand side of the store at the entry.

thanks
Mike Teeter Phone #: ###-#### Inspection requested via web by Mike Teeter
DOC - Permit Finaled11/14/201811/14/201811/14/2018PPASS
DetailsBrandon Shaw
FIRE-Final Inspection11/9/201811/13/201811/13/2018APASS
DetailsTroy Cobbley
Life safety passed. The thumbturn deadbolt on the Pick and Go room needs removed prior to a building inspection as per our conversation

please give me a call ahead of time ###-#### thanks Mike Teeter Inspection requested via web by Mike Teeter
CHANGE STATUS TO (ISS)  8/13/2018 DONE
Plan mod
Plan assigned to (JG)8/1/20188/1/20188/7/2018 PASS
DetailsJavier Guzman
Plan Mod 2 - revise locations of floor sinks at starbucks kiosk, pend plumb
Routing - PLAN CHECK8/3/2018 8/7/2018 PASS
DetailsJavier Guzman
Routing - PLUMBING8/3/2018 8/7/2018 PASS
DetailsDan Ediger
Per ISPC
Permit Ready to Issue  8/7/2018 DONE
plan mod do not re issue
Routing - PUBLIC WORKS8/3/2018 8/3/2018 PASS
DetailsMorgan Webb
Plan Modification Accepted  8/1/2018 DONE
Plan Mod 2 - revise locations of floor sinks at starbucks kiosk
FIRE-Final Inspection7/26/20187/27/20187/27/2018APART
DetailsTroy Cobbley
The Star Bucks is being given a temp with Ron's permission until a fire alarm permit is issued/inspected for the over spaced ceiling mounted 30cd horn/strobe in this space. No other areas inspected.

Phone #: ###-#### Inspection requested via web by Mike Teeter
BLD-Other7/25/20187/26/20187/26/2018APART
DetailsJim Storey
I would like to schedule a occupancy inspection for the new Starbucks Kiosk for early morning please. this is just to make sure the inspector is ok with opening the Kiosk. Please call with any questions. Mike Teeter ###-#### Phone #: ###-#### Inspection requested via web by Mike Teeter/ need wire ties 3wraps in 1 inch clips at perimitor
BLD-Wall cover7/11/20187/12/20187/12/2018APASS
DetailsJim Storey
looking for a rough inspection for Albertsons Park Center to cover Phone #: ###-#### Inspection requested via web by Mike Teeter ok pending trade aprovals
BLD-Framing/Rough-in7/11/20187/12/20187/12/2018APART
DetailsJim Storey
looking for a rough inspection for Albertsons Park Center to cover Phone #: ###-#### Inspection requested via web by Mike Teeter ok pending trade aprovals
Permit Ready to Issue  6/18/2018 DONE
PLAN MOD
CHANGE STATUS TO (ISS)  6/18/2018 DONE
Plan Mod
Inspection Record Card- Bld  6/18/2018 DONE
Plan assigned to (JG)6/5/20186/5/20186/16/2018 PASS
DetailsJavier Guzman
Plan Mod Albertsons
Routing - PLAN CHECK6/13/2018 6/16/2018 PASS
DetailsJavier Guzman
Routing - MECHANICAL6/13/2018 6/14/2018 PASS
DetailsTroy James
One supply run and electric radiant heater
Routing - Design Review6/13/2018 6/13/2018 PASS
DetailsKatelyn Menuge
No Design Review Required. Not in Design Overlay.
Meeting  6/5/2018 DONE
Plan Mod - add online pick-up area to entry vestibule & partial height CMU wall for cart storage under existing canopy

**Need COV from GC for added value prior to re-issuance**
Plan Modification Accepted  6/5/2018 DONE
DetailsChristina Prado
Plan Mod - add online pick-up area to entry vestibule & partial height CMU wall for cart storage under existing canopy

**Need COV from GC for added value prior to re-issuance**
Issue PAID IN FULL permit  6/1/2018 DONE
Inspection Record Card- Bld  6/1/2018 DONE
Plan assigned to (JG)4/25/20184/25/20185/31/2018 PASS
DetailsJavier Guzman
1st rev comp, 5/08 L2 Albertsons ePlan, pend Mech
Routing PW Environmental5/25/2018 5/31/2018 PASS
DetailsRick Christenson
Points source approved
PLANS/APPL TAKEN TO FRONT DESK  5/31/2018 DONE
Permit Ready to Issue  5/31/2018 DONE
NEED- all met
GC FORM
REVISED VALUE
Routing - PLAN CHECK5/25/2018 5/29/2018 PASS
DetailsJavier Guzman
Routing - PLUMBING5/25/2018 5/25/2018 PASS
DetailsDaryl Spivey
See redline notes and install per ISPC.
Route to Impact Fee Review5/15/20185/18/20185/16/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - MECHANICAL5/11/2018 5/15/2018 PASS
DetailsTroy James
No mechanical to review
1st review completed  5/15/2018 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK4/25/2018 5/11/2018 FAIL
DetailsJavier Guzman
Routing - FIRE4/25/20184/25/20185/7/2018 PASS
DetailsErika Akin
Attached comments to case
Intake Approval  4/25/2018 PASS
DetailsJavier Guzman
Routing - PLUMBING4/25/2018 4/25/2018 PASS
DetailsDaryl Spivey
See redline notes. Per plan and ISPC.
Routing - Addressing4/25/2018 4/25/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/25/2018 4/25/2018 PASS
DetailsMorgan Webb
Application received  4/23/2018 DONE
Application submitted via PDS Online on Apr 23 2018 1:36PM
Routing PW Environmental4/25/2018   FAIL
Starbucks Kiosk need to be connected to Grease Waste Line