Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD18-01426
StatusFinaled
Name PRO-TECH ROOFING INC
Site Address 2775 W APOLLO ST
Project NameBoise In Flight Kitchen
Customer Number 
ePlanReviewYes
Description
(BOISE IN FLIGHT KITCHEN – RE-ROOF) Permit is to remodel an existing 6,000 sq. ft. building rooftop. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of parapet metal coping and replace with new metal coping, removal of existing roof drains, removal of existing wall scuppers and downspouts and replace with new scuppers and downspouts, removal of single-ply roof membrane, removal and relocate existing select light fixtures, removal and replacement of rooftop equipment curbs, removal of (5) rooftop mechanical equipment and replace with (5) new rooftop mechanical equipment, installation of new roof assembly, electrical and mechanical work. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled5/14/20195/14/20195/14/2019PPASS
DetailsJim Storey
BLD-Aging Inspection5/6/20195/6/20195/6/2019 FAIL
DetailsJim Storey
called arch of record and chief ele about missing ele permit. no insp. exp pending
Issue PAID IN FULL permit  6/20/2018 DONE
Route to Impact Fee Review5/10/20185/13/20185/11/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JG)5/1/20185/1/20185/11/2018 PASS
DetailsJavier Guzman
1st rev comp, 5/08 L1 BOISE In Flight Kitchen ePlan, pend DR
Routing - Design Review5/11/2018 5/11/2018 PASS
DetailsKayCee Babb
Parapet alterations required for energy code compliance. No DR required.
PLANS/APPL TAKEN TO FRONT DESK  5/11/2018 DONE
Permit Ready to Issue  5/11/2018 DONE
Need
Revised cert of value
GC form
1st review completed  5/10/2018 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK5/1/2018 5/10/2018 PASS
DetailsJavier Guzman
Routing - MECHANICAL5/1/2018 5/1/2018 PASS
DetailsTroy James
Routing - Addressing5/1/2018 5/1/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/1/2018 5/1/2018 PASS
DetailsMorgan Webb
Routing - Design Review5/1/2018 5/1/2018 FAIL
DetailsKayCee Babb
Design Review application required for proposed project.
Intake Approval  5/1/2018 PASS
DetailsJavier Guzman
Print Statement  4/26/2018 DONE
Application received  4/23/2018 DONE
Application submitted via PDS Online on Apr 23 2018 3:22PM