BLD-Final | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 2.94 ACH50- 2.94
|
PubWorks Occupancy Approval | 12/3/2018 | 12/3/2018 | 12/3/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 8/30/2018 | 8/31/2018 | 8/30/2018 | A | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Wall Bracing | 8/24/2018 | 8/24/2018 | 8/24/2018 | A | PASS |
Brandon Shaw
|
|
|
|
BLD-Other | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | PASS |
Brandon Shaw
|
|
|
sofit // Les Phone #: ###-####
|
BLD-Framing/Rough-in | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | NR |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Conference | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | PASS |
Brandon Shaw
|
|
|
Foundation- work in progress
|
BLD-Foundation | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled via mobile web on Thursday, June 14, 2018.
|
BLD-Foundation | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled via mobile web on Tuesday, June 12, 2018.
|
BLD-Footing | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
PubWorks Subgrade Approval | 5/31/2018 | 5/31/2018 | 5/31/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 5/17/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/17/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/15/2018 | | |
|
|
|
|
Plan assigned to (M_H) | 4/25/2018 | | 5/15/2018 | | DONE |
Michael Hanson
|
|
|
05/14 sfd L2 ePlan. 1st review completed - See changemarks in ePlan. MDH
|
Routing - PLAN CHECK | 5/11/2018 | | 5/15/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 5/15/2018 | | DONE |
|
|
|
met
|
Plan Reviewer's activity | | | 5/11/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 5/11/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan. MDH
|
Routing - PLAN CHECK | 4/25/2018 | | 5/11/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan. MDH
|
Routing - MECHANICAL | 4/25/2018 | | 4/30/2018 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 4/25/2018 | 4/25/2018 | 4/27/2018 | | PASS |
Tim Frost
|
|
|
5/14 house FIRE SPRINKLERS ARE REQUIRED DUE TO ACCESS (REF:IFC:503.1.1)
|
Route to Impact Fee Review | 4/25/2018 | 4/28/2018 | 4/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 4/26/2018 | | 4/26/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - Addressing | 4/25/2018 | | 4/26/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/25/2018 | | 4/26/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/25/2018 | | 4/26/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Routing - PLANNING | 4/25/2018 | | 4/25/2018 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 4/25/2018 | | FAIL |
|
|
|
Stair Section Details needed
|
Plans ACCEPTED BY PLAN TECH | | | 4/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/25/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/25/2018 | | DONE |
|
|
|
|
Application received | | | 4/23/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 23 2018 3:55PM
|